ARS
ARS is a renovation/alteration project at 14785 PRESTON RD. SUITE 1030N, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $192K across about 5,616 sq ft.
๐Project Metrics
TDLR #TABS2026003644Review Complete
Design review complete, construction may proceed
ARS is a Renovation/Alteration project located at 14785 PRESTON RD. SUITE 1030N, Dallas, TX 75254 in Dallas, Texas. The project has an estimated value of $192K covering 5,616 sq ft. SIGNATURE EXCHANGE PROPERTY OWNER, LLC is the property owner and idGROUP is the design firm of record. The project was registered with TDLR on October 17, 2025.
โFrequently Asked Questions
What is ARS?
ARS is a renovation/alteration project at 14785 PRESTON RD. SUITE 1030N in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NON-STRUCTURAL INTERIOR FINISH OUT IN AN EXISTING SINGLE FLOOR SUITE. SCOPE INCLUDES HVAC AND ELECTRICAL.
Is ARS open in Dallas?
ARS is currently under construction in Dallas, TX. Its current TDLR status is "Review Complete".
Where is ARS located?
ARS is located at 14785 PRESTON RD. SUITE 1030N, Dallas, TX, 75254, in Dallas County.
Who is the owner or developer of ARS?
SIGNATURE EXCHANGE PROPERTY OWNER, LLC is the property owner/developer of record for ARS, per its TDLR project registration.
Who is the architect or design firm for ARS?
idGROUP is the design firm of record for ARS, according to its TDLR filing.
How much does ARS cost and how big is it?
ARS has an estimated construction value of $192K and approximately 5,616 square feet (about $34/sqft), based on its TDLR filing.
๐Scope of Work
NON-STRUCTURAL INTERIOR FINISH OUT IN AN EXISTING SINGLE FLOOR SUITE. SCOPE INCLUDES HVAC AND ELECTRICAL.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 17, 2025
Review Complete
Oct 17, 2025
Inspection Complete
Closed