SZB Classroom 2.802 Remodel
SZB Classroom 2.802 Remodel is a renovation/alteration project at 1912 Speedway, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $900K across about 1,523 sq ft.
๐Project Metrics
TDLR #TABS2026014858Review Complete
Design review complete, construction may proceed
SZB Classroom 2.802 Remodel is a Renovation/Alteration project located at 1912 Speedway, Austin, TX 78705 in Austin, Texas. The project has an estimated value of $900K covering 1,523 sq ft. The University of Texas at Austin is the property owner and FGM Architects is the design firm of record. The project was registered with TDLR on March 12, 2026.
โFrequently Asked Questions
What is SZB Classroom 2.802 Remodel?
SZB Classroom 2.802 Remodel is a renovation/alteration project at 1912 Speedway in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of an Existing 1523sf Classroom
Is SZB Classroom 2.802 Remodel open in Austin?
SZB Classroom 2.802 Remodel is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is SZB Classroom 2.802 Remodel located?
SZB Classroom 2.802 Remodel is located at 1912 Speedway, Austin, TX, 78705, in Travis County.
Who is the owner or developer of SZB Classroom 2.802 Remodel?
The University of Texas at Austin is the property owner/developer of record for SZB Classroom 2.802 Remodel, per its TDLR project registration.
Who is the architect or design firm for SZB Classroom 2.802 Remodel?
FGM Architects is the design firm of record for SZB Classroom 2.802 Remodel, according to its TDLR filing.
How much does SZB Classroom 2.802 Remodel cost and how big is it?
SZB Classroom 2.802 Remodel has an estimated construction value of $900K and approximately 1,523 square feet (about $591/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of an Existing 1523sf Classroom
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 12, 2026
Review Complete
Apr 1, 2026
Inspection Complete
Closed
20d
Review duration
๐Related Projects
๐คSame Owner
$5.04B total๐Related City Permits
Building permits found at or near this location
Replace sewer line 36 ft replace sewer line (old cast iron 65ft) tunnel. 2 bath kitchen and laundry by tunnel replace water heater in existing space.
Express: Foundation Repair
Replacing old zinsco sub panel inside with new current panel.
This permit request is for a stand alone meter rack for the following 3 addresses and permit #s.... 1912 S. 3RD ST. PERMIT# 2025-053083 1914 S. 3RD ST. PERMIT # 2025-053082 1916 S. 3RD ST. PERMIT # 2025-053081
New irrigation install