AISD Mendez Middle School - Building B
AISD Mendez Middle School - Building B is a renovation/alteration project at 5106 Village Square Drive, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2026. The project has an estimated value of $3.5M across about 11,706 sq ft.
๐Project Metrics
TDLR #TABS2026020602Review Complete
Design review complete, construction may proceed
AISD Mendez Middle School - Building B is a Renovation/Alteration project located at 5106 Village Square Drive, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $3.5M covering 11,706 sq ft. Austin ISD is the property owner and FGM Architects is the design firm of record. The project was registered with TDLR on May 18, 2026.
โFrequently Asked Questions
What is AISD Mendez Middle School - Building B?
AISD Mendez Middle School - Building B is a renovation/alteration project at 5106 Village Square Drive in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconfiguration of music studios, space separations via partition, overall demolition and re-installation of fixtures and finishes.
Is AISD Mendez Middle School - Building B open in Austin?
AISD Mendez Middle School - Building B is still under construction in Austin, TX, with an estimated completion of Aug 2026 according to its TDLR registration.
Where is AISD Mendez Middle School - Building B located?
AISD Mendez Middle School - Building B is located at 5106 Village Square Drive, Austin, TX, 78744, in Travis County.
Who is the owner or developer of AISD Mendez Middle School - Building B?
Austin ISD is the property owner/developer of record for AISD Mendez Middle School - Building B, per its TDLR project registration.
Who is the architect or design firm for AISD Mendez Middle School - Building B?
FGM Architects is the design firm of record for AISD Mendez Middle School - Building B, according to its TDLR filing.
How much does AISD Mendez Middle School - Building B cost and how big is it?
AISD Mendez Middle School - Building B has an estimated construction value of $3.5M and approximately 11,706 square feet (about $295/sqft), based on its TDLR filing.
๐Scope of Work
Reconfiguration of music studios, space separations via partition, overall demolition and re-installation of fixtures and finishes.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 18, 2026
Review Complete
Jun 22, 2026
Inspection Complete
Closed
35d
Review duration
๐Related Projects
๐คSame Owner
$41.1M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - TWO UNIT BLDG 2 New construction of a 2-Story Single Family Res. [3bed 2.5bath] with attached carport
ePlan: Residential Expedited Review - TWO UNIT BLDG 1 New construction of a 2-Story Single Family Res. [4bed 4bath] with attached carport
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [2bed 2bath] Work to include: First floor Interior remodel New sheet rock New wiring for can lights inside existing SFR run wiring to spa and new driveway approach.