Project intelligenceTDLR TABS2026017699Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Austin ISD | O. Henry Middle School Modernization

2610 West 10th Street, Austin, TX, 78703

Opening ~Oct 2027Review Complete

Austin ISD | O. Henry Middle School Modernization is a renovation/alteration project at 2610 West 10th Street, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2027. The project has an estimated value of $36.9M across about 156,506 sq ft.

Estimated project value
$36.9M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
156,506 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$235/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 15, 2026545 days across supplied datesOct 12, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    142 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    389 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Austin ISD | O. Henry Middle School Modernization

Austin ISD | O. Henry Middle School Modernization is a $36,855,012 renovation and alteration project located at 2610 West 10th Street in Austin, Texas. The scope of work includes additions and comprehensive renovations spanning 156,506 square feet of the existing campus.

The project is scheduled to finish in October 2027, with construction officially starting in September 2026. TDLR completed the plan review process in April 2026, marking the project status as Review Complete. This timeline represents a scheduled build window of 389 days, a period significantly longer than the 98-day median for comparable renovation filings in Travis County.

Project Scale and Design

Huckabee is the design firm of record for this modernization effort. The estimated cost works out to $235 per square foot, a figure above the county median of $103 for similar renovation and alteration projects. In terms of scale, this single project exceeds the median estimated cost of $297,000 and the median size of 3,800 square feet typically seen in Travis County renovation filings, placing it in the top quarter for cost within that category.

Austin ISD holds several other TDLR-registered projects in the region, including renovations at Lasa High School and Mendez Middle School. Huckabee has also designed similar educational facilities, such as the Franklin & Emily Pratt Learning and Leadership Center in Killeen and the Midway High School athletics addition in Waco. The presence of these comparable projects indicates a broader pattern of infrastructure investment in Texas schools by this design firm and school district.

Local Context and Permitting

City of Austin permit records show 20 permits on file at this specific street address, issued between March 2026 and September 2026. These include building, electrical, and plumbing permits, with the most recent entries explicitly describing addition and renovations at O. Henry Middle School. The area surrounding the school, identified by ZIP code 78703, has a population of approximately 22,484 residents according to U.S. Census estimates. The median household income in this ZIP code is $144,637, and the median owner-occupied home value is $1,353,500.

The project involves public funds and public land, aligning with Austin ISD’s 2022 Bond Program which includes modernization projects for multiple campuses. Ross A. Thomas is the registered accessibility specialist associated with this filing. The construction activity is part of a larger effort to update educational infrastructure in Travis County, where the unemployment rate stood at 3.9 percent in July 2026.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78703 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Austin ISD | O. Henry Middle School Modernization is a Renovation/Alteration project located at 2610 West 10th Street, Austin, TX 78703 in Austin, Texas. The project has an estimated value of $36.9M covering 156,506 sq ft. Austin ISD is the property owner and Huckabee is the design firm of record. The project was registered with TDLR on April 15, 2026.

Frequently Asked Questions

When is construction scheduled to finish?

The project is scheduled to finish in October 2027. Construction is set to begin in September 2026, following the completion of the TDLR plan review in April 2026.

What is the total estimated cost of the project?

The estimated cost for the O. Henry Middle School modernization is $36,855,012. This figure covers the addition and renovations across 156,506 square feet of the school facility.

Who is the design firm for this project?

Huckabee is the design firm of record for the O. Henry Middle School modernization. They are responsible for the architectural and design aspects of the renovation and addition work.

Is the school open to the public?

The TDLR record tracks construction status, not daily school operations. The project is scheduled to finish in October 2027, indicating active construction or preparation for construction during the 2026-2027 period.

How does this project compare to other renovations in Travis County?

At $36.8 million, this project is in the top quarter for cost among Travis County renovation filings. Its 389-day build window is longer than the county median of 98 days.

What is Austin ISD | O. Henry Middle School Modernization?

Austin ISD | O. Henry Middle School Modernization is a renovation/alteration project at 2610 West 10th Street in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition and Renovations at O Henry Middle School

Is Austin ISD | O. Henry Middle School Modernization open in Austin?

Austin ISD | O. Henry Middle School Modernization is still under construction in Austin, TX, with an estimated completion of Oct 2027 according to its TDLR registration.

Where is Austin ISD | O. Henry Middle School Modernization located?

Austin ISD | O. Henry Middle School Modernization is located at 2610 West 10th Street, Austin, TX, 78703, in Travis County.

Who is the owner or developer of Austin ISD | O. Henry Middle School Modernization?

Austin ISD is the property owner/developer of record for Austin ISD | O. Henry Middle School Modernization, per its TDLR project registration.

Who is the architect or design firm for Austin ISD | O. Henry Middle School Modernization?

Huckabee is the design firm of record for Austin ISD | O. Henry Middle School Modernization, according to its TDLR filing.

How much does Austin ISD | O. Henry Middle School Modernization cost and how big is it?

Austin ISD | O. Henry Middle School Modernization has an estimated construction value of $36.9M and approximately 156,506 square feet (about $235/sqft), based on its TDLR filing.

Scope of Work

Addition and Renovations at O Henry Middle School

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2610 West 10th Street, Austin, TX, 78703

Location by street address

Related City Permits

Building permits found at or near this location

2610 S IH 35 SVRD SB

Two-Story Addition to Existing Building

ActiveMechanical PermitAdditionSep 2026
View Details
2025-014465 MP
High Standard Home Services
2610 BRIDLE PATH

Addition & Remodel- Addition and remodel of 1st floor conditioned area. Addition of second floor conditioned area. Addition of gate. Removal of unpermitted carport and partial driveway. Carport less than 200 sq ft.

Inactive Pending RevisionBuilding PermitAddition and RemodelSep 2026
$1
View Details
2026-047682 BP
Neon Agave Homes
2610 W 10TH ST

Fireline Installation

ActivePlumbing PermitFirelineSep 2026
View Details
2026-115639 PP
2610 ST REGIS DR

Install Irrigation System

FinalPlumbing PermitIrrigationSep 2026
View Details
2026-115464 PP
2610 W 10TH ST

addition and renovations at o Henry Middle School

ActiveElectrical PermitRemodelSep 2026
View Details
2026-109875 EP
BEARD INTEGRATED SYSTEMS INC.

Watch all construction in 78703 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.