15th Floor Corridor
15th Floor Corridor is a renovation/alteration project at 5525 Granite Parkway, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $164K across about 1,333 sq ft.
๐Project Metrics
TDLR #TABS2026017734Review Complete
Design review complete, construction may proceed
15th Floor Corridor is a Renovation/Alteration project located at 5525 Granite Parkway, Plano, TX 75024 in Plano, Texas. The project has an estimated value of $164K covering 1,333 sq ft. Granite Park VI LP is the property owner and Entos Design is the design firm of record. The project was registered with TDLR on April 15, 2026.
โFrequently Asked Questions
What is 15th Floor Corridor?
15th Floor Corridor is a renovation/alteration project at 5525 Granite Parkway in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1333
Is 15th Floor Corridor open in Plano?
15th Floor Corridor is currently under construction in Plano, TX. Its current TDLR status is "Review Complete".
Where is 15th Floor Corridor located?
15th Floor Corridor is located at 5525 Granite Parkway, Plano, TX, 75024, in Collin County.
Who is the owner or developer of 15th Floor Corridor?
Granite Park VI LP is the property owner/developer of record for 15th Floor Corridor, per its TDLR project registration.
Who is the architect or design firm for 15th Floor Corridor?
Entos Design is the design firm of record for 15th Floor Corridor, according to its TDLR filing.
How much does 15th Floor Corridor cost and how big is it?
15th Floor Corridor has an estimated construction value of $164K and approximately 1,333 square feet (about $123/sqft), based on its TDLR filing.
๐Scope of Work
1333
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 15, 2026
Review Complete
Jun 27, 2026
Inspection Complete
Closed
73d
Review duration