ABHR
ABHR is a renovation/alteration project at 919 Congress Ave, Suite 1400&1500, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2026. The project has an estimated value of $1.6M across about 10,069 sq ft.
๐Project Metrics
TDLR #TABS2026019825Project Registered
Project has been registered with TDLR and is in pre-construction phase
ABHR is a Renovation/Alteration project located at 919 Congress Ave, Suite 1400&1500, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $1.6M covering 10,069 sq ft. 919 Congress Avenue LLC is the property owner and Abel Design Group is the design firm of record. The project was registered with TDLR on May 8, 2026.
โFrequently Asked Questions
What is ABHR?
ABHR is a renovation/alteration project at 919 Congress Ave, Suite 1400&1500 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THIS PROJECT RENNOVATION PRIMARILY CONSISTS OF RECEPTION AREA, OFFICES, CONFERENCE ROOM, OPEN WORK AREAS AND A SMALL BREAK ROOM. FINISHES ARE CONSIDERED MID-HIGH LEVEL.
Is ABHR open in Austin?
ABHR is still under construction in Austin, TX, with an estimated completion of Oct 2026 according to its TDLR registration.
Where is ABHR located?
ABHR is located at 919 Congress Ave, Suite 1400&1500, Austin, TX, 78701, in Travis County.
Who is the owner or developer of ABHR?
919 Congress Avenue LLC is the property owner/developer of record for ABHR, per its TDLR project registration.
Who is the architect or design firm for ABHR?
Abel Design Group is the design firm of record for ABHR, according to its TDLR filing.
How much does ABHR cost and how big is it?
ABHR has an estimated construction value of $1.6M and approximately 10,069 square feet (about $156/sqft), based on its TDLR filing.
๐Scope of Work
THIS PROJECT RENNOVATION PRIMARILY CONSISTS OF RECEPTION AREA, OFFICES, CONFERENCE ROOM, OPEN WORK AREAS AND A SMALL BREAK ROOM. FINISHES ARE CONSIDERED MID-HIGH LEVEL.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 8, 2026
Review Complete
Inspection Complete
Closed
๐Related Projects
๐๏ธSame Design Firm
$13.8M total๐Related City Permits
Building permits found at or near this location
ePlan: Commercial Expedited Review - Interior Remodel to Existing 2nd Level Areas in Hospital Phase II.
ePlan: Commercial Expedited Review - Remodel Hospital - Level 2 - Sterilizer Equipment Replacement (430 SF).
ePlan: Commercial Expedited Review - Remodel Hospital - Level 2 - Sterilizer Equipment Replacement (430 SF).
Express: Foundation repair
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 3.5bath] with Attached Carport. Bldg 1