WIT Tech TI
WIT Tech TI is a renovation/alteration project at 800 W Cesar Chavez St, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $5.2M across about 35,000 sq ft.
๐Project Metrics
TDLR #TABS2026024947Project Registered
Project has been registered with TDLR and is in pre-construction phase
WIT Tech TI is a Renovation/Alteration project located at 800 W Cesar Chavez St, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $5.2M covering 35,000 sq ft. Clarion Partners is the property owner and STG Design Inc is the design firm of record. The project was registered with TDLR on July 9, 2026.
โFrequently Asked Questions
What is WIT Tech TI?
WIT Tech TI is a renovation/alteration project at 800 W Cesar Chavez St in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior office renovations within 35,000 sf space
Is WIT Tech TI open in Austin?
WIT Tech TI is still under construction in Austin, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is WIT Tech TI located?
WIT Tech TI is located at 800 W Cesar Chavez St, Austin, TX, 78701, in Travis County.
Who is the owner or developer of WIT Tech TI?
Clarion Partners is the property owner/developer of record for WIT Tech TI, per its TDLR project registration.
Who is the architect or design firm for WIT Tech TI?
STG Design Inc is the design firm of record for WIT Tech TI, according to its TDLR filing.
How much does WIT Tech TI cost and how big is it?
WIT Tech TI has an estimated construction value of $5.2M and approximately 35,000 square feet (about $149/sqft), based on its TDLR filing.
๐Scope of Work
Interior office renovations within 35,000 sf space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 9, 2026
Review Complete
Inspection Complete
Closed
๐Related Projects
๐Related City Permits
Building permits found at or near this location
Stand Alone Electrical Permit for Small Cell Approved Permit # 2020-077794-000-00-SCP
Acquire a Stand Along Permit to install a 100 Amp Meter Pedestal for relocation of CapMetro Bus Stop. Pedestal will contain a Meter Scocket 100 Amp MCB and 16 Circuit Panel. Will provide one 120-Volt 20-Amp Circuit for power to Kiosk at Bus Stop. There is no building at this address 709 West Cerar Chavez Street.
install outside underground fireline piping.
Secondary contractor to Replace Exterior water/sewer lines to existing blgs 1 and 3. No interior work no fire lines. There is a permit for this property for interior work 2021-155504 BP
Replace/upgrade MEP systems & equipment roof stucco repair new restrooms
๐Related Site Plans
City of Austin site plan approvals at this location