Austin Texas Things

ATX Things

Explore
Contact
ATX Things logo
ATX ThingsAustin Local Guide

Your daily source for what's happening in Austin. Local guides, hidden gems, food finds, and real-time data β€” curated by locals, for locals.

Explore

  • Home
  • Discover Austin
  • Greenbelt Flows
  • Food Inspections
  • Bars & Venues

More

  • Neighborhoods
  • Economy Dashboard
  • Contact Us

Β© 2026 ATX Things β€” Made with 🀘 in Austin, TX

Real-time data from USGS and City of Austin. Not affiliated with any government agency.

πŸ“‹ Texas Bid Board/Solicitation/0006727
πŸ“‹ SolicitationπŸ† Awarded

AE Services for J. E. Rudder Building Utilization and Modernization

πŸ›οΈTexas Facilities Commission - 303

πŸ“„Description

CLASS-ITEM

DESCRIPTION

906-44

Heating; Ventilating, Air Conditioning – Architectural Services

906-52

Interior Design and Space Planning

906-58

Lighting (Interior, Exterior) – Architectural Services

906-66

Planning, Site (Installation and Project)

906-78

Security Systems – Architectural

907-38

Drafting Services

918-25

Compliance Consulting, American Disabilities Act (ADA)

925-33

Engineering Services, Professional

925-36

Engineering Services

925-42

Foundation Engineering

925-56

Inspecting, Structural Engineering

925-67

Mechanical Engineering

925-88

Structural Engineering

966-18

Copying Services (Reproduction)

SCOPE: In accordance with the provisions of TexasGovernment Code, Chapter 2254, Subchapter A, Professional Services, and Rulesand Procedures adopted by the Texas Facilities Commission (TFC), to provideprofessional AE services for design, construction, contract administration,closeout and warranty phases from NTP through March 31, 2027, supportingProject #25-026-3113, James E. Rudder State Office Building MRP project locatedat 1019 Brazos Street, Austin, Texas.

CONTRACTTERM: It isthe intention of TFC to award a Contract for full prime professionalarchitectural/engineering (AE) services for the term of the project. Servicesundertaken pursuant to this RFQ will be required to commence within five (5)calendar days of delivery of a Notice to Proceed. The Project associated withthe services requested in this solicitation is anticipated to be Four hundred thirty-five(435) calendar days.

PROJECTDESCRIPTION: Project will renovate the JamesE. Rudder State Office Building for the Secretary of State Agency providingimproved space utilization, service to public, security, code compliance, andaccommodations for additional employee headcount.

Theapproximate cost of work for the aforementioned project is estimated to be thirtymillion, nine hundred thousand ($30,900,000.00).

Phase 1:Architectural and Engineering scope of services shall include, but not belimited to, the following:

1. Detailedon-site investigations, review of existing documents, verify and validate itemsin existing deficiencies list requested for correction. Deficiency list will beprovided to the final selected firm.

2. A list ofnecessary testing and inspections to be provided to Owner including, but notlimited to, ADA, Commissioning, Testing and Balancing, Environmental, andConstruction Materials testing.

3. Assistancein evaluation and interview of Construction Manager-at-Risk.

4. Assistanceto Project Management Firm and Construction Manager-at-Risk to prepareorder-of-magnitude cost estimates for correction of deficiencies by repair orreplacement, as recommended by the AE.

5. Assist ProjectManagement Firm (PMF) and Construction Manager-at-Risk in developing prioritiesfor adjusting scope of work to match available funding.

6. Research,evaluate, and present to the Owner any energy conservation strategies andalternatives for consideration, including the availability of rebates from thelocal utility. If rebates are available,coordinate with the local utility to complete all necessary documentation toaccomplish rebates.

7. Presentationof findings to Owner and Project Management Firm for review and approval. Uponacceptance of Phase 1 findings, and authorization by Owner, proceed with Phase2.

Phase 2: Architecture and Engineering scope of services shallinclude, but not be limited to, the following:

1. Thedesign and documentation of construction plans should include a detailedbreakdown of deliverables to reduce the risk of additional service costs due tothe requirement of an Early Work Package for the basement and the Service Roomlocation on level 3.

A. TheAE's scope of services shall be delivered in the following phases:

1) Deliverable 1: 50% Construction Documents(CDs):

The 50% CD set shall be developed to aLevel of Development (LOD) 300 for all primary architectural, structural, andmain MEP/IT distribution pathways. Interior partitions and branch-leveldistribution shall be developed to LOD 200. The submission must be sufficientlydetailed to confirm overall design intent, validate space planning, and allowfor preliminary cost estimating. At a minimum, this submission shall include:

(1) Updatedfloor plans for all levels with finalized room layouts.

(2) Updatedexterior elevations and key building sections.

(3) Updatedlife safety and accessibility compliance plans.

(4) Structuralfoundation and framing plans indicating sizes of principal members.

(5) MEPsingle-line diagrams and plans showing primary equipment locations and maindistribution routes.

(6) ITplans showing telecommunications room layouts and primary cabling pathways.

2) Deliverable 2: Early Work PackageConstruction Documents

This package shall be a complete, fullycoordinated, and biddable set of construction documents developed to a Level ofDevelopment (LOD) 400 for all architectural, structural, MEP, and IT/Securitywork within the Basement and Level 3 project areas. The documents shall containsufficient detail for fabrication and installation by a constructioncontractor. This includes all specifications, details, and schedules necessaryfor permitting and construction of this specific scope of work.

3) Deliverable 3: 90% Construction Documents

The 90% CD set shall advance the design forall remaining floors (Levels 1, 2, 4, and 5) to a Level of Development (LOD)350. This includes detailing how various building systems interface and connectwith one another. The set shall be fully coordinated across all disciplines andshall incorporate all Owner-approved comments from the 50% CD review.

4) Deliverable 4: 100% Construction Documents

The 100% CD set shall be the final, signed,and sealed set of documents for the remainder of the project (Levels 1, 2, 4,and 5), incorporating all Owner-approved comments from the 90% CD review. Theset shall be complete for the purposes of regulatory approval, permitting, andconstruction.

B. Provide the Owner and PMF with a list of long-leadequipment items with sizes, specifications, etc. so that early procurement canbe performed.

C. Provide the Owner with a list of items to betested and/or inspected including, but not limited to, ADA, Commissioning,Testing and Balancing, Environmental, and Construction Materials testing.

D. Coordinate with third party commissioning agentthroughout design and construction administration.

E. Assist the Project Management Firm (Square OneConsultants) and Construction Manager-at-Risk during subcontractor solicitationfor development of Guaranteed Maximum Price.

F. Construction Administration using ProjectMates.

G. Warranty management.

H. Project closeout.

5. AEservices shall be offered with the understanding of full compliance withnon-discrimination requirements of the State of Texas by the A/E.

PRE-SUBMITTAL TELECONFERENCE: The pre-submittal conference has beenrecorded and is available for download on the ESBD and in Bonfire.

TFC is using the eProcurementsystem Bonfire. Respondents mustregister for a Bonfire account (No Charge) to submit a response. Respondents must submit theirresponses/submittals at the following link: https://tfcstate.bonfirehub.com/opportunities/199980

EVENT

DATE

Issue RFQ

8/26/2025

Site Visit

9/02/2025

Deadline for Submission of Questions

9/03/2025

Deadline for Submission of Qualifications & HSP

9/09/2025

Tuesday @ 3:00 PM

Notification to Interview

9/19/2025

If Interviews are NOT required by TFC

Award by Commission

10/16/2025

Execute Contract

11/01/2025

If Interviews are required by TFC

Interviews of short listed firms

9/29/2025

Award by Commission

10/16/2025

Execute Contract

11/01/2025

This Request for Qualifications (RFQ)is posted on the Electronic State Business Daily (ESBD) located on the TexasComptroller of Public Accounts’ web page located at

https://www.txsmartbuy.com/esbddetails/0006727

This website will have the most currentinformation during the solicitation.

🏷️Commodity Codes (NIGP)

90644-Heating; Ventilating; Air Conditioning - Architectural Services;β€” Maintenance and Repair90652-Interior Design, Decorating, Space Planning, Exhibits and Displays;β€” Maintenance and Repair90658-Lighting (Interior, Exterior) - Architectural Services;β€” Maintenance and Repair90666-Planning, Site (Installation And Project);β€” Maintenance and Repair90678-Security Systems; Intruder And Smoke Detection - Architectural;β€” Maintenance and Repair92536-Engineering Services (Not Otherwise Classified);92542-Foundation Engineering;92556-Inspecting, Structural/Engineering;92567-Mechanical Engineering;92588-Structural Engineering;
Maintenance and Repair

πŸ“ŽDocuments (11)

ESBD_449249_1756217777764_RFQ #0006727 AE Services JE Rudder Bldg FINAL.pdf

RFQ Solicitation Document

Open

ESBD_449249_1756217811038_0006727 Attachment C - HUB Compliance Reporting System - Online Process Guide.pdf

Attachment C - HUB Compliance Reporting System - Online Process Guide

Open

ESBD_449249_1756217840405_0006727 Attachment D - Contract Template.pdf

Attachment D - Contract Template

Open

ESBD_449249_1756218014279_0006727 Attachment H - Owner's Project Requirements.pdf

Attachment H - Owner's Project Requirements

Open

ESBD_449249_1756218039241_0006727 Attachment I - Utilization & Modernization Construction Narrative.pdf

Attachment I - Utilization & Modernization Construction Narrative

Open

ESBD_449249_1756218071046_0006727 Attachment J - TFC Rudder Building_High Level Sequencing Schedule_20250818.pdf

Attachment J - TFC Rudder Building High Level Sequencing Schedule

Open

ESBD_449249_1756217811038_0006727 Pre-Submittal Teleconference Audio Recording.m4a

Audio File of Pre-Submittal Conference

Open

ESBD_449249_1756217811038_0006727 Pre-Submittal Teleconference Video Recording.mp4

Video File of Pre-Submittal Conference

Open

ESBD_449249_1756228522462_0006727 Attachment G - Confidentiality and Non-Disclosure Agreement.docx

Attachment G - Confidentiality and Non-Disclosure Agreement

Open

ESBD_449249_1756998244325_0006727 Addendum #1 FINAL.pdf

Addendum #1 to RFQ #0006727

Open

ESBD_449249_1756998345487_0006727 Addendum #2 FINAL.pdf

Addendum #2 to RFQ #0006727

Open

Documents available on the original posting.

πŸ”—More from Texas Facilities Commission - 303

πŸ“

CMR for Permian Basin Beacon Park

Postedβ€’Due: May 12, 2026
πŸ“

CMR for DSHS Public Health Laboratory

Postedβ€’Due: May 12, 2026
πŸ“

CMR for Permian Basin Infrastructure Project

Postedβ€’Due: Apr 20, 2026
πŸ“‹

IFB for Replacement Cedar Fence – TSBVI Superintendent’s Residence

Addendum Postedβ€’Due: Mar 6, 2026
πŸ“‹

IFB for Replacement Dust Collection System – TSD Woodshop

Addendum Postedβ€’Due: Mar 12, 2026

πŸ†Texas Facilities Commission - 303 Award History

This agency has awarded 8 contracts

RFP for Doors, Coiling Grilles, Turnstiles, Vehicle Barriers, and Dock Levelers

IDIQ Professional Engineering Services, HVAC & TAB and Related Professional Services

IDIQ Professional Civil Engineering & Land Surveying Services

IDIQ Professional Engineering Services for Geotechnical, Construction Materials Testing, and Related Professional Services

BUILDING SYSTEMS AND ENVELOPE COMMISSIONING SERVICES FOR TEXAS SCHOOL FOR THE DEAF

Job Order Contracting General Contractor Services

RFP for Building Automation Systems Maintenance and Repair Services

Parking Garage Clean Up - 2025 UT Football Games, Austin, TX

Key Details

Solicitation ID
0006727
Status
πŸ† Awarded
Contract has been awarded
Due Date
September 9, 2025at 3:00 PM
Posted
August 26, 2025
Posting Requirement
2

πŸ‘€ Contact

James Gonzalez

james.gonzalez@tfc.texas.gov(512) 936-0647

πŸ›οΈ Agency

Texas Facilities Commission

πŸ›οΈ State Agency

Agency #303

View all Texas Facilities Commission bids β†’

View the official posting on TX SmartBuy

View on TX SmartBuy
Back to Texas Bid Board