Widen 4 Lane Roadway, Divided, Add Continuous Two Way Left Turn Lane; project did not meet the VE study requirements until 95% PS&E. Due to changes in the project design, the TPC reached the $40 million threshold during our latest estimate updates
Type of Work: Intersection Improvements With Right And/Or Left T
Highway: US 69
Location: FM 326 N to 3.0 mi S of FM 326 N
County: Angelina
Working Days: 180.0
Oversight: State
Spec Book Year: 2024.0
$38.41M
Engineer's estimate / low bid estimate from TxDOT
Jesse Sisco
Jesse.Sisco@txdot.govTxDOT - Lufkin District