WEAVER AND TIDWELL
WEAVER AND TIDWELL is a renovation/alteration project at 9311 SAN PEDRO STE 1400, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2009). The project has an estimated value of $400K.
๐Project Metrics
TDLR #EABPRJB0801305Project Closed
Project has been completed and closed
WEAVER AND TIDWELL is a Renovation/Alteration project located at 9311 SAN PEDRO STE 1400, San Antonio, TX 76216 in San Antonio, Texas. The project has an estimated value of $400K. ENDURA ADVISORY GROUP is the property owner and CARSON DESIGN ASSOCIATES is the design firm of record. The project was registered with TDLR on October 1, 2009.
โFrequently Asked Questions
What is WEAVER AND TIDWELL?
WEAVER AND TIDWELL is a renovation/alteration project at 9311 SAN PEDRO STE 1400 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: build out suite in existing space
Is WEAVER AND TIDWELL open in San Antonio?
Construction on WEAVER AND TIDWELL is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2009. The building is finished and very likely open.
Where is WEAVER AND TIDWELL located?
WEAVER AND TIDWELL is located at 9311 SAN PEDRO STE 1400, San Antonio, TX, 76216, in Bexar County.
Who is the owner or developer of WEAVER AND TIDWELL?
ENDURA ADVISORY GROUP is the property owner/developer of record for WEAVER AND TIDWELL, per its TDLR project registration.
Who is the architect or design firm for WEAVER AND TIDWELL?
CARSON DESIGN ASSOCIATES is the design firm of record for WEAVER AND TIDWELL, according to its TDLR filing.
How much does WEAVER AND TIDWELL cost and how big is it?
WEAVER AND TIDWELL has an estimated construction value of $400K, based on its TDLR filing.
๐Scope of Work
build out suite in existing space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 1, 2009
Review Complete
Inspection Complete
Closed
Dec 1, 2009