CSJ 3049-01-027
CSJ 3049-01-027 is a addition / renovation project at FM 646 FROM IH45 TO SH3, Galveston, Texas, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2013). The project has an estimated value of $159K.
πProject Metrics
TDLR #EABPRJB1000281Project Closed
Project has been completed and closed
CSJ 3049-01-027 is a Addition / Renovation project located at FM 646 FROM IH45 TO SH3, Galveston, TX in Texas. The project has an estimated value of $159K. TEXAS DEPARTMENT OF TRANSPORTATION is the property owner and TXDOT is the design firm of record. The project was registered with TDLR on May 17, 2011.
βFrequently Asked Questions
What is CSJ 3049-01-027?
CSJ 3049-01-027 is a addition / renovation project at FM 646 FROM IH45 TO SH3, Galveston in Texas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: WIDEN 2 TO 4 LANES, DURB RAMPS, SIDE WALK PEDBI/IV PF175 RV250 IN350
Is CSJ 3049-01-027 open in Texas?
Construction on CSJ 3049-01-027 is complete β TDLR records show the project passed its required accessibility inspection in Sep 2013. The building is finished and very likely open.
Where is CSJ 3049-01-027 located?
CSJ 3049-01-027 is located at FM 646 FROM IH45 TO SH3, Galveston, Texas, TX, in Galveston County.
Who is the owner or developer of CSJ 3049-01-027?
TEXAS DEPARTMENT OF TRANSPORTATION is the property owner/developer of record for CSJ 3049-01-027, per its TDLR project registration.
Who is the architect or design firm for CSJ 3049-01-027?
TXDOT is the design firm of record for CSJ 3049-01-027, according to its TDLR filing.
How much does CSJ 3049-01-027 cost and how big is it?
CSJ 3049-01-027 has an estimated construction value of $159K, based on its TDLR filing.
πScope of Work
WIDEN 2 TO 4 LANES, DURB RAMPS, SIDE WALK PEDBI/IV PF175 RV250 IN350
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
π Compliance Timeline
π Project Timeline
Filed
May 17, 2011
Review Complete
Inspection Complete
Closed
Sep 30, 2013