ULTA #519
ULTA #519 is a renovation/alteration project at 12909 SHOPS PARKWAY Suite 400, Bee Cave, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2011). The project has an estimated value of $300K.
๐Project Metrics
TDLR #EABPRJB1813144Project Closed
Project has been completed and closed
ULTA #519 is a Renovation/Alteration project located at 12909 SHOPS PARKWAY Suite 400, Bee Cave, TX 78738 in Bee Cave, Texas. The project has an estimated value of $300K. BEE CAVE GALLERIA is the property owner and RGLA is the design firm of record. The project was registered with TDLR on June 6, 2011.
โFrequently Asked Questions
What is ULTA #519?
ULTA #519 is a renovation/alteration project at 12909 SHOPS PARKWAY Suite 400 in Bee Cave, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior buildi-out of a new 9,300 square foot mercantile tenant space.
Is ULTA #519 open in Bee Cave?
Construction on ULTA #519 is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2011. The building is finished and very likely open.
Where is ULTA #519 located?
ULTA #519 is located at 12909 SHOPS PARKWAY Suite 400, Bee Cave, TX, 78738, in Travis County.
Who is the owner or developer of ULTA #519?
BEE CAVE GALLERIA is the property owner/developer of record for ULTA #519, per its TDLR project registration.
Who is the architect or design firm for ULTA #519?
RGLA is the design firm of record for ULTA #519, according to its TDLR filing.
How much does ULTA #519 cost and how big is it?
ULTA #519 has an estimated construction value of $300K, based on its TDLR filing.
๐Scope of Work
Interior buildi-out of a new 9,300 square foot mercantile tenant space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 6, 2011
Review Complete
Inspection Complete
Closed
Oct 1, 2011
๐Related Projects
๐Nearby Projects
Within 1 km๐Related City Permits
Building permits found at or near this location
Install elec srv for 40hp well pump eud
New Elec Srv For Exst. Lease Space Only-Eud(MarshallS)
New Elec.Srv For Exst. Lease Space Only-Eud(Old Navy)
New Elec Srv Only*Houste Meter*-Eud (Bldg.3)
New Elec Srv-Shell Bldg. Only-Eud(Bldg. K)