JJA CORPORATION
JJA CORPORATION is a renovation/alteration project at 1925 RUTLAND DR. BLDG. J, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2013). The project has an estimated value of $68K.
๐Project Metrics
TDLR #EABPRJB3805181Project Closed
Project has been completed and closed
JJA CORPORATION is a Renovation/Alteration project located at 1925 RUTLAND DR. BLDG. J, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $68K. SHERRY TACK is the property owner and MAD ARCHITECTURE is the design firm of record. The project was registered with TDLR on December 10, 2012.
โFrequently Asked Questions
What is JJA CORPORATION?
JJA CORPORATION is a renovation/alteration project at 1925 RUTLAND DR. BLDG. J in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel to create a commissary kitchen.
Is JJA CORPORATION open in Austin?
Construction on JJA CORPORATION is complete โ TDLR records show the project passed its required accessibility inspection in May 2013. The building is finished and very likely open.
Where is JJA CORPORATION located?
JJA CORPORATION is located at 1925 RUTLAND DR. BLDG. J, Austin, TX, 78758, in Travis County.
Who is the owner or developer of JJA CORPORATION?
SHERRY TACK is the property owner/developer of record for JJA CORPORATION, per its TDLR project registration.
Who is the architect or design firm for JJA CORPORATION?
MAD ARCHITECTURE is the design firm of record for JJA CORPORATION, according to its TDLR filing.
How much does JJA CORPORATION cost and how big is it?
JJA CORPORATION has an estimated construction value of $68K, based on its TDLR filing.
๐Scope of Work
Interior remodel to create a commissary kitchen.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 10, 2012
Review Complete
Inspection Complete
Closed
May 1, 2013
๐Related Projects
๐๏ธSame Design Firm
$6.0M total๐Related City Permits
Building permits found at or near this location
Emergency Repair of damaged disconnect ONLY per Hyatt Dunn
replacement of grease interceptor
Replacement of existing WICF with a larger WICF. Removal of existing kitchen egress door and construction of new kitchen.
Replacement of existing WICF with a larger WICF. Removal of existing kitchen egress door and construction of new kitchen.
Replacement of existing WICF with a larger WICF. Removal of existing kitchen egress door and construction of new kitchen.