O LUCKY TRUCK STOP
O LUCKY TRUCK STOP is a renovation/alteration project at 11960 HWY 59, Livingston, in Polk County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2013). The project has an estimated value of $300K.
๐Project Metrics
TDLR #EABPRJB3809162Project Closed
Project has been completed and closed
O LUCKY TRUCK STOP is a Renovation/Alteration project located at 11960 HWY 59, Livingston, TX 77351 in Livingston, Texas. The project has an estimated value of $300K. DAPINDER SOOD is the property owner and DS4 DESIGN STUDIO 4 LLC is the design firm of record. The project was registered with TDLR on February 26, 2013.
โFrequently Asked Questions
What is O LUCKY TRUCK STOP?
O LUCKY TRUCK STOP is a renovation/alteration project at 11960 HWY 59 in Livingston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of first floor of existing building.
Is O LUCKY TRUCK STOP open in Livingston?
Construction on O LUCKY TRUCK STOP is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2013. The building is finished and very likely open.
Where is O LUCKY TRUCK STOP located?
O LUCKY TRUCK STOP is located at 11960 HWY 59, Livingston, TX, 77351, in Polk County.
Who is the owner or developer of O LUCKY TRUCK STOP?
DAPINDER SOOD is the property owner/developer of record for O LUCKY TRUCK STOP, per its TDLR project registration.
Who is the architect or design firm for O LUCKY TRUCK STOP?
DS4 DESIGN STUDIO 4 LLC is the design firm of record for O LUCKY TRUCK STOP, according to its TDLR filing.
How much does O LUCKY TRUCK STOP cost and how big is it?
O LUCKY TRUCK STOP has an estimated construction value of $300K, based on its TDLR filing.
๐Scope of Work
Renovation of first floor of existing building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 26, 2013
Review Complete
Inspection Complete
Closed
Jun 1, 2013