TIPTON FORD PAINT CENTER
TIPTON FORD PAINT CENTER is a additions to existing building project at 3840 N. EXPRESSWAY 83, Brownsville, in Cameron County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2014). The project has an estimated value of $140K.
๐Project Metrics
TDLR #EABPRJB4805720Project Closed
Project has been completed and closed
TIPTON FORD PAINT CENTER is a Additions to Existing Building project located at 3840 N. EXPRESSWAY 83, Brownsville, TX 78526 in Brownsville, Texas. The project has an estimated value of $140K. JIM TIPTON is the property owner and CASA ENGINEERING LLC is the design firm of record. The project was registered with TDLR on December 10, 2013.
โFrequently Asked Questions
What is TIPTON FORD PAINT CENTER?
TIPTON FORD PAINT CENTER is a additions to existing building project at 3840 N. EXPRESSWAY 83 in Brownsville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Provide perimeter beam with footings and install new pre-engineered metal building.
Is TIPTON FORD PAINT CENTER open in Brownsville?
Construction on TIPTON FORD PAINT CENTER is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2014. The building is finished and very likely open.
Where is TIPTON FORD PAINT CENTER located?
TIPTON FORD PAINT CENTER is located at 3840 N. EXPRESSWAY 83, Brownsville, TX, 78526, in Cameron County.
Who is the owner or developer of TIPTON FORD PAINT CENTER?
JIM TIPTON is the property owner/developer of record for TIPTON FORD PAINT CENTER, per its TDLR project registration.
Who is the architect or design firm for TIPTON FORD PAINT CENTER?
CASA ENGINEERING LLC is the design firm of record for TIPTON FORD PAINT CENTER, according to its TDLR filing.
How much does TIPTON FORD PAINT CENTER cost and how big is it?
TIPTON FORD PAINT CENTER has an estimated construction value of $140K, based on its TDLR filing.
๐Scope of Work
Provide perimeter beam with footings and install new pre-engineered metal building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 10, 2013
Review Complete
Inspection Complete
Closed
Apr 1, 2014