GREAT CLIPS
GREAT CLIPS is a renovation/alteration project at 405 N GUADALUPE ST., San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2014). The project has an estimated value of $75K.
๐Project Metrics
TDLR #EABPRJB4821610Project Closed
Project has been completed and closed
GREAT CLIPS is a Renovation/Alteration project located at 405 N GUADALUPE ST., San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $75K. ANDERSON CAPITAL GROUP LLC is the property owner and HOPSON BUILDERS INC is the design firm of record. The project was registered with TDLR on August 26, 2014.
โFrequently Asked Questions
What is GREAT CLIPS?
GREAT CLIPS is a renovation/alteration project at 405 N GUADALUPE ST. in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel Rental Space
Is GREAT CLIPS open in San Marcos?
Construction on GREAT CLIPS is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2014. The building is finished and very likely open.
Where is GREAT CLIPS located?
GREAT CLIPS is located at 405 N GUADALUPE ST., San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of GREAT CLIPS?
ANDERSON CAPITAL GROUP LLC is the property owner/developer of record for GREAT CLIPS, per its TDLR project registration.
Who is the architect or design firm for GREAT CLIPS?
HOPSON BUILDERS INC is the design firm of record for GREAT CLIPS, according to its TDLR filing.
How much does GREAT CLIPS cost and how big is it?
GREAT CLIPS has an estimated construction value of $75K, based on its TDLR filing.
๐Scope of Work
Remodel Rental Space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 26, 2014
Review Complete
Inspection Complete
Closed
Dec 1, 2014
๐Related Projects
๐๏ธSame Design Firm
$835K total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work HVAC changeout: remove and replace existing 2.5-ton vertical gas furnace and matching outdoor condenser with new like-for-like 2.5-ton split system; no structural change.
Replacement of complete existing central heat and air system with or without duct work
60 ft trench to reroute kitchen and laundry line
Replacement of HVAC System
Express: plumbing fixture replacement like-for-like window replacement new HVAC and water heater exempt work (like-for-like door replacement new cabinets/countertops/appliances)