RENOVATIONS AT RIDGETOP ELEMENTARYSCHOOL
๐Project Metrics
TDLR #EABPRJB5814090Project Closed
Project has been completed and closed
๐Scope of Work
New theater seating, stage entrance door, roof ladders,and gutter work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$3.3M total๐๏ธSame Design Firm
$705K total๐Related City Permits
Building permits found at or near this location
Lexington Park / New irrigation system
replace 200 amp meter can for bad block on old can fire haszard
Install Level 2 EV Charger
Callaghan 830-M-L Is a New one-story single family residence with (4) bedrooms (2) bathrooms an attached two-car garage and a covered entry porch and patio.
Replacement of complete existing central heat and air system with or without duct work