SS86 CAR WASH ADDITION
SS86 CAR WASH ADDITION is a additions to existing building project at 2998 I-45, Conroe, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2016). The project has an estimated value of $1.0M.
๐Project Metrics
TDLR #EABPRJB6815528Inspection Complete
Final inspection completed, awaiting project closure
SS86 CAR WASH ADDITION is a Additions to Existing Building project located at 2998 I-45, Conroe, TX 77303 in Conroe, Texas. The project has an estimated value of $1.0M. SPEEDY STOP FOOD STORES LLC is the property owner and ZEMANEK ARCHITECTURE + DESIGN is the design firm of record. The project was registered with TDLR on May 2, 2016.
โFrequently Asked Questions
What is SS86 CAR WASH ADDITION?
SS86 CAR WASH ADDITION is a additions to existing building project at 2998 I-45 in Conroe, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of a Tunnel car wash to the rear of the existing building
Is SS86 CAR WASH ADDITION open in Conroe?
Construction on SS86 CAR WASH ADDITION is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2016. The building is finished and very likely open.
Where is SS86 CAR WASH ADDITION located?
SS86 CAR WASH ADDITION is located at 2998 I-45, Conroe, TX, 77303, in Montgomery County.
Who is the owner or developer of SS86 CAR WASH ADDITION?
SPEEDY STOP FOOD STORES LLC is the property owner/developer of record for SS86 CAR WASH ADDITION, per its TDLR project registration.
Who is the architect or design firm for SS86 CAR WASH ADDITION?
ZEMANEK ARCHITECTURE + DESIGN is the design firm of record for SS86 CAR WASH ADDITION, according to its TDLR filing.
How much does SS86 CAR WASH ADDITION cost and how big is it?
SS86 CAR WASH ADDITION has an estimated construction value of $1.0M, based on its TDLR filing.
๐Scope of Work
Addition of a Tunnel car wash to the rear of the existing building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 2, 2016
Review Complete
Inspection Complete
Dec 1, 2016
Closed