MASSAGE ENVY
MASSAGE ENVY is a renovation/alteration project at 5401 SOUTH FM 1626 Suite 140, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2016). The project has an estimated value of $200K.
๐Project Metrics
TDLR #EABPRJB6822400Project Closed
Project has been completed and closed
MASSAGE ENVY is a Renovation/Alteration project located at 5401 SOUTH FM 1626 Suite 140, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $200K. DDR CORPORATION is the property owner and DANIELS AND LOVELADY ARCHITECTURE is the design firm of record. The project was registered with TDLR on August 10, 2016.
โFrequently Asked Questions
What is MASSAGE ENVY?
MASSAGE ENVY is a renovation/alteration project at 5401 SOUTH FM 1626 Suite 140 in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing tenant finish-out. No site work isincluded.
Is MASSAGE ENVY open in Kyle?
Construction on MASSAGE ENVY is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2016. The building is finished and very likely open.
Where is MASSAGE ENVY located?
MASSAGE ENVY is located at 5401 SOUTH FM 1626 Suite 140, Kyle, TX, 78640, in Hays County.
Who is the owner or developer of MASSAGE ENVY?
DDR CORPORATION is the property owner/developer of record for MASSAGE ENVY, per its TDLR project registration.
Who is the architect or design firm for MASSAGE ENVY?
DANIELS AND LOVELADY ARCHITECTURE is the design firm of record for MASSAGE ENVY, according to its TDLR filing.
How much does MASSAGE ENVY cost and how big is it?
MASSAGE ENVY has an estimated construction value of $200K, based on its TDLR filing.
๐Scope of Work
Remodel of existing tenant finish-out. No site work isincluded.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 10, 2016
Review Complete
Inspection Complete
Closed
Nov 1, 2016
๐Related Projects
๐คSame Owner
$1.3M total๐๏ธSame Design Firm
$131.3M total๐Related City Permits
Building permits found at or near this location
Express: Tub to shower conversion
Express: Tub to shower conversion
New garage with apartment and a separate permit for pre-manufactured pool inside the building
Replace 40 of cast iron pipe in between floors Per PC: (7/15/26) ...Bathroom cast iron re-piping includes new toilet flange new vertical piping in wall to past sink drain connections of both upstairs and downstairs. (This will not exceed 128 sq ft drywall damage) new mainline drop to concrete new pee trap on upstairs shower but re-use of shower drain. Install single piece dual flush Toto toilet after inspection.
Addition/Interior Remodel - Approx 612 sqft Interior remodel to existing single family adding half bath converting existing garage into new master suite - adding 612 sqft new attached garage