CALTEX TENANT FINISH OUT
CALTEX TENANT FINISH OUT is a renovation/alteration project at 12805 BELTEX Suites D100 thru D400, Manor, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2018). The project has an estimated value of $65K.
๐Project Metrics
TDLR #EABPRJB8807757Project Closed
Project has been completed and closed
CALTEX TENANT FINISH OUT is a Renovation/Alteration project located at 12805 BELTEX Suites D100 thru D400, Manor, TX 78653 in Manor, Texas. The project has an estimated value of $65K. 4M PROPERTIES INC is the property owner and BROWN GROUP, THE is the design firm of record. The project was registered with TDLR on January 4, 2018.
โFrequently Asked Questions
What is CALTEX TENANT FINISH OUT?
CALTEX TENANT FINISH OUT is a renovation/alteration project at 12805 BELTEX Suites D100 thru D400 in Manor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior finish out of office in existing shell building
Is CALTEX TENANT FINISH OUT open in Manor?
Construction on CALTEX TENANT FINISH OUT is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2018. The building is finished and very likely open.
Where is CALTEX TENANT FINISH OUT located?
CALTEX TENANT FINISH OUT is located at 12805 BELTEX Suites D100 thru D400, Manor, TX, 78653, in Travis County.
Who is the owner or developer of CALTEX TENANT FINISH OUT?
4M PROPERTIES INC is the property owner/developer of record for CALTEX TENANT FINISH OUT, per its TDLR project registration.
Who is the architect or design firm for CALTEX TENANT FINISH OUT?
BROWN GROUP, THE is the design firm of record for CALTEX TENANT FINISH OUT, according to its TDLR filing.
How much does CALTEX TENANT FINISH OUT cost and how big is it?
CALTEX TENANT FINISH OUT has an estimated construction value of $65K, based on its TDLR filing.
๐Scope of Work
interior finish out of office in existing shell building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 4, 2018
Review Complete
Inspection Complete
Closed
Mar 1, 2018
๐Related Projects
๐Related City Permits
Building permits found at or near this location
install/replace 200 amp main breaker panel and meter can (overhead)
Replacement of complete existing central heat and air system with or without duct work
Express- Remove and replace 7 windows: like for like no structural changes.
Replacement of complete existing central heat and air system with or without duct work 2.5 ton heat pump HVAC system changeout like for like
Emergency Job - Main Panel Replacement due to arcing meter base and grounding ***Emergency inspection done on 4/30/25-Hyatt***