CELIS BEER GARDEN
CELIS BEER GARDEN is a renovation/alteration project at 2101 RUTLAND BLVD., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $675K.
๐Project Metrics
TDLR #EABPRJB8818682Project Registered
Project has been registered with TDLR and is in pre-construction phase
CELIS BEER GARDEN is a Renovation/Alteration project located at 2101 RUTLAND BLVD., Austin, TX 78758 in Austin, Texas. The project has an estimated value of $675K. CELIS BREWERY is the property owner and OPA DESIGN STUDIO is the design firm of record. The project was registered with TDLR on June 5, 2018.
โFrequently Asked Questions
What is CELIS BEER GARDEN?
CELIS BEER GARDEN is a renovation/alteration project at 2101 RUTLAND BLVD. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of existing storage building for use an alternate taproom with an attached open air beer garden, toilet
Is CELIS BEER GARDEN open in Austin?
CELIS BEER GARDEN is currently under construction in Austin, TX. Its current TDLR status is "Project Registered".
Where is CELIS BEER GARDEN located?
CELIS BEER GARDEN is located at 2101 RUTLAND BLVD., Austin, TX, 78758, in Travis County.
Who is the owner or developer of CELIS BEER GARDEN?
CELIS BREWERY is the property owner/developer of record for CELIS BEER GARDEN, per its TDLR project registration.
Who is the architect or design firm for CELIS BEER GARDEN?
OPA DESIGN STUDIO is the design firm of record for CELIS BEER GARDEN, according to its TDLR filing.
How much does CELIS BEER GARDEN cost and how big is it?
CELIS BEER GARDEN has an estimated construction value of $675K, based on its TDLR filing.
๐Scope of Work
Remodel of existing storage building for use an alternate taproom with an attached open air beer garden, toilet
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 5, 2018
Review Complete
Inspection Complete
Closed
๐Related Projects
๐๏ธSame Design Firm
$70.6M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Pool- Demo existing pool ASR (Separate Demo Application to come). Construct new pool and spa existing infrastructure onsite no decking or patio.
7 DAY - retroactive submisison of documents for review for Certificate of Occipancy. the work was completed without a permit there is no new work proposed in the submission - OVA
Pool- Demo existing pool ASR (Separate Demo Application to come). Construct new pool and spa existing infrastructure onsite no decking or patio.
Tenant process improvement including demising wall for production room exterior gas storage enclosure and gas piping for production.