PHILOMENA AL
PHILOMENA AL is a new construction project at 350 PHILOMENA DRIVE, Kyle, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2019). The project has an estimated value of $10.0M.
๐Project Metrics
TDLR #EABPRJB8819471Project Closed
Project has been completed and closed
PHILOMENA AL is a New Construction project located at 350 PHILOMENA DRIVE, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $10.0M. PHILOMENA ASSISTED LIVING LLC is the property owner and DFD ARCHITECTS INC is the design firm of record. The project was registered with TDLR on June 14, 2018.
โFrequently Asked Questions
What is PHILOMENA AL?
PHILOMENA AL is a new construction project at 350 PHILOMENA DRIVE in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Single story wood construction, slab on grade assisted living facility, of Approximately 64,000 sq. ft.
Is PHILOMENA AL open in Kyle?
Construction on PHILOMENA AL is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2019. The building is finished and very likely open.
Where is PHILOMENA AL located?
PHILOMENA AL is located at 350 PHILOMENA DRIVE, Kyle, TX, 78640, in Travis County.
Who is the owner or developer of PHILOMENA AL?
PHILOMENA ASSISTED LIVING LLC is the property owner/developer of record for PHILOMENA AL, per its TDLR project registration.
Who is the architect or design firm for PHILOMENA AL?
DFD ARCHITECTS INC is the design firm of record for PHILOMENA AL, according to its TDLR filing.
How much does PHILOMENA AL cost and how big is it?
PHILOMENA AL has an estimated construction value of $10.0M, based on its TDLR filing.
๐Scope of Work
Single story wood construction, slab on grade assisted living facility, of Approximately 64,000 sq. ft.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 14, 2018
Review Complete
Inspection Complete
Closed
Aug 1, 2019
๐Related Projects
๐๏ธSame Design Firm
$518.5M total๐Related City Permits
Building permits found at or near this location
Install Car Charger Circuit
Replacement of complete existing central heat and air system with or without duct work
Interior remodel to existing Lt manufacturing areas.
QT - install 6 steel piles to prevent further downward movement of existing church
Express: Foundation Repair - installing 25 EXT & 17 int pilings
Property Owner
Design Firm
Registered Accessibility Specialist
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis