SPEC SUITE 203
SPEC SUITE 203 is a renovation/alteration project at 5310 HARVEST HILL RD Suite 203, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $65K.
๐Project Metrics
TDLR #EABPRJB8822049Review Complete
Design review complete, construction may proceed
SPEC SUITE 203 is a Renovation/Alteration project located at 5310 HARVEST HILL RD Suite 203, Dallas, TX 75230 in Dallas, Texas. The project has an estimated value of $65K. BPRE TOLL HILL HOLDINGS LP % BALFOUR PACIFIC CAPITAL is the property owner and GO STUDIO is the design firm of record. The project was registered with TDLR on July 20, 2018.
โFrequently Asked Questions
What is SPEC SUITE 203?
SPEC SUITE 203 is a renovation/alteration project at 5310 HARVEST HILL RD Suite 203 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing office space in low-rise office building.
Is SPEC SUITE 203 open in Dallas?
SPEC SUITE 203 is currently under construction in Dallas, TX. Its current TDLR status is "Review Complete".
Where is SPEC SUITE 203 located?
SPEC SUITE 203 is located at 5310 HARVEST HILL RD Suite 203, Dallas, TX, 75230, in Dallas County.
Who is the owner or developer of SPEC SUITE 203?
BPRE TOLL HILL HOLDINGS LP % BALFOUR PACIFIC CAPITAL is the property owner/developer of record for SPEC SUITE 203, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE 203?
GO STUDIO is the design firm of record for SPEC SUITE 203, according to its TDLR filing.
How much does SPEC SUITE 203 cost and how big is it?
SPEC SUITE 203 has an estimated construction value of $65K, based on its TDLR filing.
๐Scope of Work
Renovation of existing office space in low-rise office building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 20, 2018
Review Complete
Jul 20, 2018
Inspection Complete
Closed