JDI
JDI is a renovation/alteration project at 1023 SPRINGDALE ROAD Building 5, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $600K.
๐Project Metrics
TDLR #EABPRJB8822123Review Complete
Design review complete, construction may proceed
JDI is a Renovation/Alteration project located at 1023 SPRINGDALE ROAD Building 5, Austin, TX 78721 in Austin, Texas. The project has an estimated value of $600K. CENTRAL AUSTIN MANAGEMENT GROUP is the property owner and MATT FAJKUS ARCHITECTURE is the design firm of record. The project was registered with TDLR on July 23, 2018.
โFrequently Asked Questions
What is JDI?
JDI is a renovation/alteration project at 1023 SPRINGDALE ROAD Building 5 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Commercial interior finish out of existing commercial shell building for Group B office. Approximately 9,000sqft
Is JDI open in Austin?
JDI is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is JDI located?
JDI is located at 1023 SPRINGDALE ROAD Building 5, Austin, TX, 78721, in Travis County.
Who is the owner or developer of JDI?
CENTRAL AUSTIN MANAGEMENT GROUP is the property owner/developer of record for JDI, per its TDLR project registration.
Who is the architect or design firm for JDI?
MATT FAJKUS ARCHITECTURE is the design firm of record for JDI, according to its TDLR filing.
How much does JDI cost and how big is it?
JDI has an estimated construction value of $600K, based on its TDLR filing.
๐Scope of Work
Commercial interior finish out of existing commercial shell building for Group B office. Approximately 9,000sqft
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 23, 2018
Review Complete
Jul 23, 2018
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$5.2M total๐๏ธSame Design Firm
$16.2M total๐Related City Permits
Building permits found at or near this location
Tunnel 6 feet under home to repair drain line
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 ton horizontal gas
Temporary meter loop ref. 2026-077259 BP
Express- Temp meter loop demo walls/ceilings throughout home. Demo flooring and pad to subfloor and use fans to dry out affected areas. Remove debris. The scope of work is limited to emergency services due to a lightning strike and interior repairs. This includes drywall patching and finishing only. There will bve no structural alterations to the walls or ceilings and no framing layout changes or load-bearing components modified.