SWA FTC SOUTH RESTACK is a renovation/alteration project at 2750 SEELCCO STR, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.0M.
๐Project Metrics
TDLR #EABPRJB9803453Project Registered
Project has been registered with TDLR and is in pre-construction phase
SWA FTC SOUTH RESTACK is a Renovation/Alteration project located at 2750 SEELCCO STR, Dallas, TX 75235 in Dallas, Texas. The project has an estimated value of $1.0M. DALLAS CITY OF is the property owner and BOKA POWELL is the design firm of record. The project was registered with TDLR on October 19, 2018.
โFrequently Asked Questions
What is SWA FTC SOUTH RESTACK?
SWA FTC SOUTH RESTACK is a renovation/alteration project at 2750 SEELCCO STR in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Demolition for restack/renovation
Is SWA FTC SOUTH RESTACK open in Dallas?
SWA FTC SOUTH RESTACK is currently under construction in Dallas, TX. Its current TDLR status is "Project Registered".
Where is SWA FTC SOUTH RESTACK located?
SWA FTC SOUTH RESTACK is located at 2750 SEELCCO STR, Dallas, TX, 75235, in Dallas County.
Who is the owner or developer of SWA FTC SOUTH RESTACK?
DALLAS CITY OF is the property owner/developer of record for SWA FTC SOUTH RESTACK, per its TDLR project registration.
Who is the architect or design firm for SWA FTC SOUTH RESTACK?
BOKA POWELL is the design firm of record for SWA FTC SOUTH RESTACK, according to its TDLR filing.
How much does SWA FTC SOUTH RESTACK cost and how big is it?
SWA FTC SOUTH RESTACK has an estimated construction value of $1.0M, based on its TDLR filing.
๐Scope of Work
Interior Demolition for restack/renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 19, 2018
Review Complete
Inspection Complete
Closed