SPEC SUITES 7TH FLOOR
SPEC SUITES 7TH FLOOR is a renovation/alteration project at 1320 GREENWAY, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2019). The project has an estimated value of $234K.
๐Project Metrics
TDLR #EABPRJB9803927Project Closed
Project has been completed and closed
SPEC SUITES 7TH FLOOR is a Renovation/Alteration project located at 1320 GREENWAY, Irving, TX 75038 in Irving, Texas. The project has an estimated value of $234K. BOF TX TOWER 1320 LLC is the property owner and ENTOS DESIGN is the design firm of record. The project was registered with TDLR on October 29, 2018.
โFrequently Asked Questions
What is SPEC SUITES 7TH FLOOR?
SPEC SUITES 7TH FLOOR is a renovation/alteration project at 1320 GREENWAY in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Renovation.
Is SPEC SUITES 7TH FLOOR open in Irving?
Construction on SPEC SUITES 7TH FLOOR is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2019. The building is finished and very likely open.
Where is SPEC SUITES 7TH FLOOR located?
SPEC SUITES 7TH FLOOR is located at 1320 GREENWAY, Irving, TX, 75038, in Dallas County.
Who is the owner or developer of SPEC SUITES 7TH FLOOR?
BOF TX TOWER 1320 LLC is the property owner/developer of record for SPEC SUITES 7TH FLOOR, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITES 7TH FLOOR?
ENTOS DESIGN is the design firm of record for SPEC SUITES 7TH FLOOR, according to its TDLR filing.
How much does SPEC SUITES 7TH FLOOR cost and how big is it?
SPEC SUITES 7TH FLOOR has an estimated construction value of $234K, based on its TDLR filing.
๐Scope of Work
Interior Renovation.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 29, 2018
Review Complete
Inspection Complete
Closed
Jan 1, 2019