Don Hart Radiator
Don Hart Radiator is a new construction project at 20123 FM 362 N, Waller, in Waller County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $800K across about 6,372 sq ft.
๐Project Metrics
TDLR #TABS2019005076Review Complete
Design review complete, construction may proceed
Don Hart Radiator is a New Construction project located at 20123 FM 362 N, Waller, TX 77484 in Waller, Texas. The project has an estimated value of $800K covering 6,372 sq ft. Don Hart is the property owner and RJS Architects is the design firm of record. The project was registered with TDLR on February 18, 2019.
โFrequently Asked Questions
What is Don Hart Radiator?
Don Hart Radiator is a new construction project at 20123 FM 362 N in Waller, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Two new metallic buildings added on the Don Hart Radiator site.
Is Don Hart Radiator open in Waller?
Don Hart Radiator is currently under construction in Waller, TX. Its current TDLR status is "Review Complete".
Where is Don Hart Radiator located?
Don Hart Radiator is located at 20123 FM 362 N, Waller, TX, 77484, in Waller County.
Who is the owner or developer of Don Hart Radiator?
Don Hart is the property owner/developer of record for Don Hart Radiator, per its TDLR project registration.
Who is the architect or design firm for Don Hart Radiator?
RJS Architects is the design firm of record for Don Hart Radiator, according to its TDLR filing.
How much does Don Hart Radiator cost and how big is it?
Don Hart Radiator has an estimated construction value of $800K and approximately 6,372 square feet (about $126/sqft), based on its TDLR filing.
๐Scope of Work
Two new metallic buildings added on the Don Hart Radiator site.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 18, 2019
Review Complete
Feb 18, 2019
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$1.3M total๐Nearby Projects
Within 1 kmProperty Owner
Design Firm
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Waller County
Find General Contractors in Waller