SH 6 Shared Use Path
SH 6 Shared Use Path is a new construction project at SH 6 East Frontage Rd From O.R.R. To FM 158, Bryan, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2020). The project has an estimated value of $1.1M across about 82,971 sq ft.
๐Project Metrics
TDLR #TABS2019012084Project Closed
Project has been completed and closed
SH 6 Shared Use Path is a New Construction project located at SH 6 East Frontage Rd From O.R.R. To FM 158, Bryan, TX 77803 in Bryan, Texas. The project has an estimated value of $1.1M covering 82,971 sq ft. TxDOT District: Bryan is the property owner and Goodwin-Lasiter-Strong is the design firm of record. The project was registered with TDLR on May 20, 2019.
โFrequently Asked Questions
What is SH 6 Shared Use Path?
SH 6 Shared Use Path is a new construction project at SH 6 East Frontage Rd From O.R.R. To FM 158 in Bryan, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of new concrete shared use path including grading, toe walls, retaining walls and culvert extensions.
Is SH 6 Shared Use Path open in Bryan?
Construction on SH 6 Shared Use Path is complete โ TDLR records show the project passed its required accessibility inspection in May 2020. The building is finished and very likely open.
Where is SH 6 Shared Use Path located?
SH 6 Shared Use Path is located at SH 6 East Frontage Rd From O.R.R. To FM 158, Bryan, TX, 77803, in Brazos County.
Who is the owner or developer of SH 6 Shared Use Path?
TxDOT District: Bryan is the property owner/developer of record for SH 6 Shared Use Path, per its TDLR project registration.
Who is the architect or design firm for SH 6 Shared Use Path?
Goodwin-Lasiter-Strong is the design firm of record for SH 6 Shared Use Path, according to its TDLR filing.
How much does SH 6 Shared Use Path cost and how big is it?
SH 6 Shared Use Path has an estimated construction value of $1.1M and approximately 82,971 square feet (about $13/sqft), based on its TDLR filing.
๐Scope of Work
Installation of new concrete shared use path including grading, toe walls, retaining walls and culvert extensions.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 20, 2019
Review Complete
Inspection Complete
Closed
May 29, 2020
๐Related Projects
๐คSame Owner
$37.03B totalProperty Owner
Design Firm
Registered Accessibility Specialist