Hutto Community Park Phase One Improvements
๐Project Metrics
TDLR #TABS2020001876Review Complete
Design review complete, construction may proceed
๐Scope of Work
Renovate existing park, replace existing play equipment, add sidewalk to complete a loop, install upgraded irrigation system, resurface existing basketball court.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$8.8M total๐Related City Permits
Building permits found at or near this location
Residential Expedited Review - Interior remodel for 2-story residence w/ new kitchen updated secondary bathroom new closets raised ceilings. Replace exterior siding & replace main floor windows to match upstairs windows. New floors & drywall.
Residential Expedited Review - Interior remodel for 2-story residence w/ new kitchen updated secondary bathroom new closets raised ceilings. Replace exterior siding & replace main floor windows to match upstairs windows. New floors & drywall.
T Pole Ref 2025-139018 BP
New 2-story 3 bedroom 3.5 bathroom small lot single family residence with attached carport covered porch and uncovered wood deck.
New pool (39 x 15) and Spa (9 x 8) - removing 192 sqft of existing concrete