Project intelligenceTDLR EABPRJB7815341New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

TAP LIMMER LOOP SIDEWALK in Hutto, TX

COTTONWOOD ELEM TO FM 1660 N, Hutto, TX, 78634

Target date passed (Jun 2018)Review Complete

TAP LIMMER LOOP SIDEWALK is a new construction project at COTTONWOOD ELEM TO FM 1660 N, Hutto, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2018 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.1M.

Estimated project value
$1.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 19, 2017408 days across supplied datesJun 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    196 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    212 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78634 (Hutto)

One email per change. Unsubscribe in one click. Privacy.

TAP LIMMER LOOP SIDEWALK is a New Construction project located at COTTONWOOD ELEM TO FM 1660 N, Hutto, TX 78634 in Hutto, Texas. The project has an estimated value of $1.1M. CITY OF HUTTO is the property owner and BINKLEY & BARFIELD INC. is the design firm of record. The project was registered with TDLR on April 19, 2017.

Frequently Asked Questions

What is TAP LIMMER LOOP SIDEWALK?

TAP LIMMER LOOP SIDEWALK is a new construction project at COTTONWOOD ELEM TO FM 1660 N in Hutto, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Install sidewalks along the south side of Limmer Loop from Cottonwood Creek Elementary to FM 1660N. Includes ram

Is TAP LIMMER LOOP SIDEWALK open in Hutto?

TAP LIMMER LOOP SIDEWALK was scheduled to finish construction in Jun 2018 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is TAP LIMMER LOOP SIDEWALK located?

TAP LIMMER LOOP SIDEWALK is located at COTTONWOOD ELEM TO FM 1660 N, Hutto, TX, 78634, in Williamson County.

Who is the owner or developer of TAP LIMMER LOOP SIDEWALK?

CITY OF HUTTO is the property owner/developer of record for TAP LIMMER LOOP SIDEWALK, per its TDLR project registration.

Who is the architect or design firm for TAP LIMMER LOOP SIDEWALK?

BINKLEY & BARFIELD INC. is the design firm of record for TAP LIMMER LOOP SIDEWALK, according to its TDLR filing.

How much does TAP LIMMER LOOP SIDEWALK cost and how big is it?

TAP LIMMER LOOP SIDEWALK has an estimated construction value of $1.1M, based on its TDLR filing.

Scope of Work

Install sidewalks along the south side of Limmer Loop from Cottonwood Creek Elementary to FM 1660N. Includes ram

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

COTTONWOOD ELEM TO FM 1660 N, Hutto, TX, 78634

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78634 (Hutto)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.