Project intelligenceTDLR EABPRJB7821166New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

2016 STREET RECONSTRUCTION PROJECT in Deer Park, TX

9TH ST, 12TH ST, BARON LN, Cork Ln, Dahlia Ln, Ember Ln, Deer Park, TX, 77536

Target date passed (Jan 2019)Review Complete

2016 STREET RECONSTRUCTION PROJECT is a new construction project at 9TH ST, 12TH ST, BARON LN, Cork Ln, Dahlia Ln, Ember Ln, Deer Park, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2019 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $490K.

Estimated project value
$490K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 14, 2017536 days across supplied datesJan 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    49 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    487 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77536 (Deer Park)

One email per change. Unsubscribe in one click. Privacy.

2016 STREET RECONSTRUCTION PROJECT is a New Construction project located at 9TH ST, 12TH ST, BARON LN, Cork Ln, Dahlia Ln, Ember Ln, Deer Park, TX 77536 in Deer Park, Texas. The project has an estimated value of $490K. CITY OF DEER PARK is the property owner and BINKLEY & BARFIELD INC. is the design firm of record. The project was registered with TDLR on July 14, 2017.

Frequently Asked Questions

What is 2016 STREET RECONSTRUCTION PROJECT?

2016 STREET RECONSTRUCTION PROJECT is a new construction project at 9TH ST, 12TH ST, BARON LN, Cork Ln, Dahlia Ln, Ember Ln in Deer Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Street reconstruction including replacing sidewalks andcurb ramps within the public right of way.

Is 2016 STREET RECONSTRUCTION PROJECT open in Deer Park?

2016 STREET RECONSTRUCTION PROJECT was scheduled to finish construction in Jan 2019 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is 2016 STREET RECONSTRUCTION PROJECT located?

2016 STREET RECONSTRUCTION PROJECT is located at 9TH ST, 12TH ST, BARON LN, Cork Ln, Dahlia Ln, Ember Ln, Deer Park, TX, 77536, in Harris County.

Who is the owner or developer of 2016 STREET RECONSTRUCTION PROJECT?

CITY OF DEER PARK is the property owner/developer of record for 2016 STREET RECONSTRUCTION PROJECT, per its TDLR project registration.

Who is the architect or design firm for 2016 STREET RECONSTRUCTION PROJECT?

BINKLEY & BARFIELD INC. is the design firm of record for 2016 STREET RECONSTRUCTION PROJECT, according to its TDLR filing.

How much does 2016 STREET RECONSTRUCTION PROJECT cost and how big is it?

2016 STREET RECONSTRUCTION PROJECT has an estimated construction value of $490K, based on its TDLR filing.

Scope of Work

Street reconstruction including replacing sidewalks andcurb ramps within the public right of way.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9TH ST, 12TH ST, BARON LN, Cork Ln, Dahlia Ln, Ember Ln, Deer Park, TX, 77536

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77536 (Deer Park)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Deer Park?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.