Project intelligenceTDLR TABS2026002383Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

FREEDOM PARK BASEBALL FIELD

3105 N DOWNING ST, Angleton, TX, 77515

Target date passed (Aug 2026)Review Complete

FREEDOM PARK BASEBALL FIELD is a renovation/alteration project at 3105 N DOWNING ST, Angleton, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.3M across about 198,200 sq ft.

Estimated project value
$1.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
198,200 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$6/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 2, 2025333 days across supplied datesAug 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    95 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    23 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    215 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About FREEDOM PARK BASEBALL FIELD

The Freedom Park Baseball Field in Angleton is a $1,268,500 renovation project filed under the name Freedom Park. Located at 3105 N Downing St in Brazoria County, the work involves the construction of a new baseball field featuring dugouts, covered bleachers, and an access walk. The City of Angleton is the owner of record, and Burditt Consultants serves as the design firm for this 198,200 sq ft improvement.

According to the TDLR record, plan review was completed in January 2026, and construction was scheduled to begin in the same month. The filing lists an estimated completion date of August 2026. However, TDLR has not yet recorded a final inspection, meaning the current state of the site is not confirmed in the public record. The project status is marked as Review Complete, but the lack of a final inspection record prevents confirmation of whether the physical work is finished.

This project is part of a broader series of infrastructure investments by the City of Angleton. The city has six other TDLR-registered projects totaling $4,703,600, including the Abigail Arias Park and the Angleton Recreation Center Expansion. Burditt Consultants, the design firm, has worked on six other registered projects totaling $20,800,560, such as the Clark Henry Park in Jersey Village and the Kansas Avenue Kayak Launch in League City. This pattern indicates a consistent partnership between the city and the design firm for public facility improvements.

Context and Comparisons

Compared to other renovation and alteration filings in Brazoria County, this project stands out in scale and duration. The estimated cost is above the county median of $250,000 for similar work. The scheduled build window of 238 days is longer than the county median of 95 days. The cost per square foot is $6, which is below the county median of $89. These figures suggest a large-scale outdoor infrastructure project rather than a typical interior renovation.

Third-party sources provide additional context about the project's planning. A Facebook post by thefactsnews described plans for the Freedom Park field expansion, noting that Angleton shortened foul lines and revised dugouts. A PDF from angleton.tx.us details the work as including a new 375-foot baseball field, dugouts, covered seating, and landscape improvements. Bid information from bidnetdirect.com confirms that competitive sealed proposals were requested for the baseball field construction and renovation.

The area profile for ZIP code 77515, based on U.S. Census ACS 2023 five-year estimates, shows a population of about 33,092. The median household income is $89,029, and the median owner-occupied home value is $210,800. Housing in the area is predominantly owner-occupied. These demographic details provide a snapshot of the community that will benefit from the new baseball field facilities.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77515 (Angleton)

One email per change. Unsubscribe in one click. Privacy.

FREEDOM PARK BASEBALL FIELD is a Renovation/Alteration project located at 3105 N DOWNING ST, Angleton, TX 77515 in Angleton, Texas. The project has an estimated value of $1.3M covering 198,200 sq ft. CITY OF ANGLETON is the property owner and BURDITT CONSULTANTS is the design firm of record. The project was registered with TDLR on October 2, 2025.

Frequently Asked Questions

Is the Freedom Park Baseball Field open?

The TDLR record has not yet recorded a final inspection. Third-party sources describe planning and bidding activities, but no source confirms the facility is open for public use.

Who is building the Freedom Park Baseball Field?

The City of Angleton is the owner of record, and Burditt Consultants is the design firm. The scope includes new dugouts, covered bleachers, and an access walk.

How much did the Freedom Park project cost?

The estimated cost listed in the filing is $1,268,500. This is above the county median for renovation projects in Brazoria County.

What is the square footage of the project?

The project covers 198,200 sq ft. The cost per square foot is $6, which is below the county median of $89.

When was the project registered with TDLR?

The project was registered with TDLR in October 2025. Plan review was completed in January 2026, and construction was scheduled to start in January 2026.

What is FREEDOM PARK BASEBALL FIELD?

FREEDOM PARK BASEBALL FIELD is a renovation/alteration project at 3105 N DOWNING ST in Angleton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of new baseball field with dugouts, covered bleachers and access walk.

Is FREEDOM PARK BASEBALL FIELD open in Angleton?

FREEDOM PARK BASEBALL FIELD was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is FREEDOM PARK BASEBALL FIELD located?

FREEDOM PARK BASEBALL FIELD is located at 3105 N DOWNING ST, Angleton, TX, 77515, in Brazoria County.

Who is the owner or developer of FREEDOM PARK BASEBALL FIELD?

CITY OF ANGLETON is the property owner/developer of record for FREEDOM PARK BASEBALL FIELD, per its TDLR project registration.

Who is the architect or design firm for FREEDOM PARK BASEBALL FIELD?

BURDITT CONSULTANTS is the design firm of record for FREEDOM PARK BASEBALL FIELD, according to its TDLR filing.

How much does FREEDOM PARK BASEBALL FIELD cost and how big is it?

FREEDOM PARK BASEBALL FIELD has an estimated construction value of $1.3M and approximately 198,200 square feet (about $6/sqft), based on its TDLR filing.

Scope of Work

Construction of new baseball field with dugouts, covered bleachers and access walk.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3105 N DOWNING ST, Angleton, TX, 77515

Location by street address

Watch all construction in 77515 (Angleton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Angleton?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.