Project has been completed and closed
Florence ISD | Florence High School Renovations is a Renovation/Alteration project located at 401 FM 970, Florence, TX 76527 in Florence, Texas. The project has an estimated value of $1.8M covering 1 sq ft. Florence Independent School District is the property owner and Huckabee & Associates, Inc. is the design firm of record. The project was registered with TDLR on December 20, 2019.
Renovations at Florence High School for Florence ISD.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 20, 2019
Review Complete
Inspection Complete
Closed
Jun 28, 2021
Building permits found at or near this location
In ground pool with autofill/heating system - concrete deck with footers.
Replace 200A Service Meter. Underground Service. Home is occupied. Also replacing main service panel. contact - Bert 214-566-4319
Addition/remodel. 2-story addition to rear/side of existing noncomplying single family residence. Addition will consist of a new primary suite half bathroom laundry room covered decks and enlarged kitchen and dining room on 1st floor and 2 bedrooms 2 bathrooms and a balcony on the 2nd floor. Remodel kitchen and reconfigure layout to accommodate addition. Addition/remodel will result in a 5 bedroom 4.5 bathroom single family residence.
AT&T Proposes the following scope of work: Tower SOW- Install: new mount (8) CCI Antennas (4) air antennas (12) Radios (2) raycap surge arrestors (2) fiber trucks & (6)DC Trunks. Ground SOW: Remove (e) T-Mobile cabinets & equipt. Utilize (E) concrete pad. Install: (1) canopy (1) 20kW Diesel generator (1)DC Power plant (9) rectifiers (8) 190AH Batteries (1) 200A Elec. Meter(1) ice bridge See Drawings for full scope of work.
Replacement of complete existing central heat and air system with or without duct work