Austin Fire Department Station #10-Locker Room Project Phase 6
๐Project Metrics
TDLR #TABS2020014574Project Closed
Project has been completed and closed
๐Scope of Work
Interior renovations to existing fire station building including addition of new gear storage closet and exercise room
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$4.2M total๐Related City Permits
Building permits found at or near this location
Replace an existing Option generator and automatic Transfer Switch and add a Docking Station on the new concrete equipment pad for the existing fire station. Site plan exemption not require less than 100 sq ft
Replace an existing Option generator and automatic Transfer Switch and add a Docking Station on the new concrete equipment pad for the existing fire station. Site plan exemption not require less than 100 sq ft
Replace an existing Option generator and automatic Transfer Switch and add a Docking Station on the new concrete equipment pad for the existing fire station. Site plan exemption not require less than 100 sq ft
Total Demo of SFR 864 Sqft Circa 1960 (Only B is being demoed. Listed as a 2 fam dwelling but its 2 detached dwellings) ** Cap off Water/Wastewater residential total demo**
Express: Replace 1 window like for like
๐Related Site Plans
City of Austin site plan approvals at this location