Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
INW -TSBPE Renovation
7915 Cameron Rd, Austin, TX, 78754
INW -TSBPE Renovation is a renovation/alteration project at 7915 Cameron Rd, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $500K across about 1,254 sq ft.
- Estimated project value
- $500K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,254 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $399/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 7 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
76 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
211 days after the preceding date shown.
Source: TDLR filing
View source record
📰About INW -TSBPE Renovation
The INW -TSBPE Renovation project at 7915 Cameron Rd in Austin involves a 1,254 sq ft alteration of a facility managed by the Texas Facilities Commission. Located in the Heritage Hills neighborhood of Travis County, this work is registered with TDLR and involves public funds. The filing specifies a scope that includes new restrooms, a new HVAC system, and electrical upgrades at testing stations.
Project Scope and Costs
With an estimated cost of $500,000, the project calculates to $399 per square foot. This figure is above the Travis County median of $103 per square foot for similar renovation filings. The total budget also exceeds the county median estimated cost of $296,684 for renovation and alteration projects. CasaBella Architects serves as the design firm of record, bringing experience from other significant Texas Facilities Commission projects, including the Barbara Jordan State Office Building and the George H. W. Bush Building.
Construction was scheduled to begin in February 2026, with a completion date listed for August 2026. The scheduled build window of 211 days is longer than the Travis County median of 98 days for comparable work. TDLR completed plan review in November 2025, and the status is marked as Review Complete. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.
This area, ZIP code 78754, has a population of about 31,410 according to U.S. Census ACS 2023 estimates. Nearby businesses include Nature's Own Chimney Cleaning and Austin Area Urban League. The Travis County unemployment rate was 4 percent in June 2026, a figure higher than a year earlier.
Third-party records, such as those on projects.constructconnect.com, list this as a renovation of a municipal facility in Austin. The project is one of several registered by the Texas Facilities Commission, which has six other TDLR-registered projects totaling $2,598,196 in the state. CasaBella Architects has also designed six other TDLR-registered projects, with a combined value of $70,900,000.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78754 (Austin)
One email per change. Unsubscribe in one click. Privacy.
INW -TSBPE Renovation is a Renovation/Alteration project located at 7915 Cameron Rd, Austin, TX 78754 in Austin, Texas. The project has an estimated value of $500K covering 1,254 sq ft. Texas Facilities Commission is the property owner and CasaBella Architects is the design firm of record. The project was registered with TDLR on November 17, 2025.
Frequently Asked Questions
Is the INW -TSBPE renovation complete?
TDLR has not yet recorded a final inspection. While the filing listed an August 2026 completion date, the public record does not confirm that the work is finished.
What work is included in the scope?
The filing specifies new restrooms, a new HVAC system, and electrical upgrades at testing stations within the 1,254 sq ft facility.
Who owns the facility?
The owner of record is the Texas Facilities Commission. The project involves public funds and is located in Travis County.
How much does the project cost per square foot?
The estimated cost is $500,000 for 1,254 sq ft, resulting in a cost of $399 per square foot.
Who is the architect?
CasaBella Architects is the design firm of record for this renovation project.
What is INW -TSBPE Renovation?
INW -TSBPE Renovation is a renovation/alteration project at 7915 Cameron Rd in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New restrooms, HVAC System, Electrical at testing stations.
Is INW -TSBPE Renovation open in Austin?
INW -TSBPE Renovation was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is INW -TSBPE Renovation located?
INW -TSBPE Renovation is located at 7915 Cameron Rd, Austin, TX, 78754, in Travis County.
Who is the owner or developer of INW -TSBPE Renovation?
Texas Facilities Commission is the property owner/developer of record for INW -TSBPE Renovation, per its TDLR project registration.
Who is the architect or design firm for INW -TSBPE Renovation?
CasaBella Architects is the design firm of record for INW -TSBPE Renovation, according to its TDLR filing.
How much does INW -TSBPE Renovation cost and how big is it?
INW -TSBPE Renovation has an estimated construction value of $500K and approximately 1,254 square feet (about $399/sqft), based on its TDLR filing.
Scope of Work
New restrooms, HVAC System, Electrical at testing stations.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
7915 Cameron Rd, Austin, TX, 78754
Related Projects
Same Owner
$1.54B totalRelated City Permits
Building permits found at or near this location
Replacing meter can and breaker box.
Install EVSE
Tunnel under the foundation to repair break on the 3 inch PVC sewer drain line underneath the home
Replacement of complete existing central heat and air system with or without duct work Upflow in closet.
Replacement of an existing water heater
Watch all construction in 78754 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.