HS 100 600 wings
HS 100 600 wings is a renovation/alteration project at 500 Orange, Vidor, in Orange County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2020). The project has an estimated value of $200K across about 5,500 sq ft.
๐Project Metrics
TDLR #TABS2020016476Project Closed
Project has been completed and closed
HS 100 600 wings is a Renovation/Alteration project located at 500 Orange, Vidor, TX 77662 in Vidor, Texas. The project has an estimated value of $200K covering 5,500 sq ft. Vidor ISD is the property owner and Architects Inc is the design firm of record. The project was registered with TDLR on April 29, 2020.
โFrequently Asked Questions
What is HS 100 600 wings?
HS 100 600 wings is a renovation/alteration project at 500 Orange in Vidor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Reconstruction
Is HS 100 600 wings open in Vidor?
Construction on HS 100 600 wings is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2020. The building is finished and very likely open.
Where is HS 100 600 wings located?
HS 100 600 wings is located at 500 Orange, Vidor, TX, 77662, in Orange County.
Who is the owner or developer of HS 100 600 wings?
Vidor ISD is the property owner/developer of record for HS 100 600 wings, per its TDLR project registration.
Who is the architect or design firm for HS 100 600 wings?
Architects Inc is the design firm of record for HS 100 600 wings, according to its TDLR filing.
How much does HS 100 600 wings cost and how big is it?
HS 100 600 wings has an estimated construction value of $200K and approximately 5,500 square feet (about $36/sqft), based on its TDLR filing.
๐Scope of Work
Interior Reconstruction
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 29, 2020
Review Complete
Inspection Complete
Closed
Aug 31, 2020