Project intelligenceTDLR TABS2026002697Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Gymnasium Renovations in Vidor, TX

500 Orange st, Vidor, TX, 77662

Target date passed (Aug 2026)Review Complete

Gymnasium Renovations is a renovation/alteration project at 500 Orange st, Vidor, in Orange County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $3.0M across about 26,098 sq ft.

Estimated project value
$3.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
26,098 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$115/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 7, 2025327 days across supplied datesAug 30, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    55 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    272 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Gymnasium Renovations

Vidor High School at 500 Orange Street in Vidor, Texas, is the site of a renovation project filed under the name Gymnasium Renovations. The work involves the renovation of the gym and locker room within the existing structure. The project scope covers 26,098 sq ft of space, with an estimated cost of $3,000,000. This places the cost at $115 per square foot, a figure that is above the Orange County median of $73 for similar renovation and alteration filings.

Project Scope and Funding

The owner of record is Vidor ISD, which has registered several other projects in the area, including additions to Vidor Elementary and Oak Forest Elementary. This specific project involves public funds and public land. The registered accessibility specialist for the filing is David Clark Teel. The project was registered with TDLR in October 2025, and plan review was completed in the same month. Construction was scheduled to begin in December 2025, with a planned completion date of August 2026.

The scheduled build window for this project is 272 days, which is longer than the county median of 109 days for renovation and alteration projects. The estimated cost of $3,000,000 is in the top quarter of Orange County filings for this type of work, which have a median estimated cost of $250,000.

TDLR has not yet recorded a final inspection for this project. Therefore, the current state of the site is not confirmed in the public record. The project status is listed as Review Complete, but the absence of a final inspection record means that the renovation work has not been officially closed out by the state authority. This status applies to the specific scope of the gym and locker room renovation described in the filing.

Vidor ISD is the developer for this project, which is part of a broader portfolio of school infrastructure work in the district. Other registered projects in the immediate area include additions to Vidor Elementary and new construction for commercial businesses such as Popeyes Vidor and Golden Chick - Vidor. The local area includes established businesses like Oakwood Manor Nursing Home and Buna Electric Motor Service, Inc. The project fits within a community where the median household income is estimated at $71,755 according to U.S. Census ACS 2023 five-year estimates for ZIP 77662.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77662 (Vidor)

One email per change. Unsubscribe in one click. Privacy.

Gymnasium Renovations is a Renovation/Alteration project located at 500 Orange st in Vidor, Texas. The project has an estimated value of $3.0M covering 26,098 sq ft. Vidor ISD is the property owner. The project was registered with TDLR on October 7, 2025.

Frequently Asked Questions

What is the current status of the Vidor High School gym renovation?

TDLR has not yet recorded a final inspection for this project. While plan review was completed in October 2025 and construction was scheduled to finish in August 2026, the public record does not confirm that the work is finished.

How much does the Vidor High School renovation cost per square foot?

The estimated cost is $3,000,000 for 26,098 sq ft, resulting in a cost of $115 per square foot. This is above the Orange County median of $73 per square foot for similar renovation projects.

Who is the owner of the Vidor High School gym project?

The owner of record is Vidor ISD. The registered accessibility specialist for the filing is David Clark Teel, and the project involves public funds and public land.

Is the Vidor High School gym renovation open to the public?

The TDLR record does not indicate that the business is open or operating. It only tracks construction and accessibility compliance. Since a final inspection has not been recorded, the site's current operational status is not confirmed.

Where is the Vidor High School gym renovation located?

The project is located at 500 Orange Street in Vidor, Texas, in Orange County.

What is Gymnasium Renovations?

Gymnasium Renovations is a renovation/alteration project at 500 Orange st in Vidor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Gym and locker room renovation

Is Gymnasium Renovations open in Vidor?

Gymnasium Renovations was scheduled to finish construction in Aug 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Gymnasium Renovations located?

Gymnasium Renovations is located at 500 Orange st, Vidor, TX, 77662, in Orange County.

Who is the owner or developer of Gymnasium Renovations?

Vidor ISD is the property owner/developer of record for Gymnasium Renovations, per its TDLR project registration.

How much does Gymnasium Renovations cost and how big is it?

Gymnasium Renovations has an estimated construction value of $3.0M and approximately 26,098 square feet (about $115/sqft), based on its TDLR filing.

Scope of Work

Gym and locker room renovation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

500 Orange st, Vidor, TX, 77662

Loading location map…
30.12380, -94.00729

Watch all construction in 77662 (Vidor)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.