Additions in Vidor, TX
2400 Hwy 12, Vidor, TX, 77662
Additions is a additions to existing building project at 2400 Hwy 12, Vidor, in Orange County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Feb 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $6.4M across about 12,442 sq ft.
- Estimated project value
- $6.4M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 12,442 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $518/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 11 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
18 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
333 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Additions
Oak Forest Elementary in Vidor is undergoing a $6,442,187 expansion to add 12,442 square feet of new classroom space. Located at 2400 Hwy 12 in Orange County, this addition to the existing building is owned by Vidor ISD. The project was registered with TDLR in March 2025, with plan review completed the same month. Construction was scheduled to begin in April 2025 and finish in February 2026.
The filing lists the scope of work specifically as a new classroom addition. David Clark Teel serves as the registered accessibility specialist for this project. The design firm of record is Architects Inc. Because the project involves public funds and public land, it is subject to state accessibility standards. The estimated cost per square foot is $518.
Project Status and Context
TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The scheduled build window of 333 days is close to the county median of 317 days for similar additions. The project’s estimated cost is above the Orange County median of $1,225,000 for additions to existing buildings. The $518 per square foot cost is also above the county median of $329.
Vidor ISD has six other TDLR-registered projects totaling $78,747,806, including work on Vidor High School and Pine Forest Elementary. Architects Inc has completed six other registered projects totaling $29,253,520, such as the Vidor Middle School addition. This area is part of a broader development context in Orange County, where other registered projects include new construction for Gold Fuel and Wetlands Transportation.
The local area profile for ZIP 77662 indicates a population of about 25,193 and a median household income of $71,755 according to U.S. Census ACS 2023 estimates. The median owner-occupied home value is $124,800. Orange County’s unemployment rate was 5.3 percent in August 2026, lower than a year earlier. These economic factors provide context for the scale of public investment in educational infrastructure in the region.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77662 (Vidor)
One email per change. Unsubscribe in one click. Privacy.
Additions is a Additions to Existing Building project located at 2400 Hwy 12 in Vidor, Texas. The project has an estimated value of $6.4M covering 12,442 sq ft. Vidor ISD is the property owner and Architects Inc is the design firm of record. The project was registered with TDLR on March 14, 2025.
Frequently Asked Questions
What is the current status of the Oak Forest Elementary addition?
TDLR has not yet recorded a final inspection. Plan review completed in March 2025, and construction was scheduled to finish in February 2026, but the site's final status is not confirmed in the public record.
How much does the Oak Forest Elementary project cost?
The estimated cost is $6,442,187. This works out to $518 per square foot for the 12,442 square feet of new classroom space added to the existing building in Vidor.
Who is building the new classroom addition at Oak Forest Elementary?
Vidor ISD is the owner of record. Architects Inc is the design firm. David Clark Teel is the registered accessibility specialist. The project involves public funds and is located at 2400 Hwy 12 in Orange County.
Is the Oak Forest Elementary addition finished?
The filing lists a completion date of February 2026, but TDLR has not yet recorded a final inspection. Therefore, the construction is not confirmed as complete in the public record.
What is Additions?
Additions is a additions to existing building project at 2400 Hwy 12 in Vidor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New classroom addition
Is Additions open in Vidor?
Additions was scheduled to finish construction in Feb 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Additions located?
Additions is located at 2400 Hwy 12, Vidor, TX, 77662, in Orange County.
Who is the owner or developer of Additions?
Vidor ISD is the property owner/developer of record for Additions, per its TDLR project registration.
Who is the architect or design firm for Additions?
Architects Inc is the design firm of record for Additions, according to its TDLR filing.
How much does Additions cost and how big is it?
Additions has an estimated construction value of $6.4M and approximately 12,442 square feet (about $518/sqft), based on its TDLR filing.
Scope of Work
New classroom addition
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2400 Hwy 12, Vidor, TX, 77662
Related Projects
Same Owner
$78.8M totalSame Design Firm
$3.87B totalWatch all construction in 77662 (Vidor)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Vidor?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.