Casetta Ranch
Casetta Ranch is a new construction project at 1284 Goforth Road, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2022). The project has an estimated value of $1.4M across about 2,430 sq ft.
๐Project Metrics
TDLR #TABS2021004855Project Closed
Project has been completed and closed
Casetta Ranch is a New Construction project located at 1284 Goforth Road, Kyle, TX 78640 in Kyle, Texas. The project has an estimated value of $1.4M covering 2,430 sq ft. Brohn Homes is the property owner and OPA Design Studio is the design firm of record. The project was registered with TDLR on November 23, 2020.
โFrequently Asked Questions
What is Casetta Ranch?
Casetta Ranch is a new construction project at 1284 Goforth Road in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: NEW GROUND UP CONSTRUCTION OF A 1920 SF AMENITY CENTER AND NEW 510 SF PAVILION, WITH ASSOCIATED FENCED POOL DECK AND SWIMMING POOL.
Is Casetta Ranch open in Kyle?
Construction on Casetta Ranch is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2022. The building is finished and very likely open.
Where is Casetta Ranch located?
Casetta Ranch is located at 1284 Goforth Road, Kyle, TX, 78640, in Hays County.
Who is the owner or developer of Casetta Ranch?
Brohn Homes is the property owner/developer of record for Casetta Ranch, per its TDLR project registration.
Who is the architect or design firm for Casetta Ranch?
OPA Design Studio is the design firm of record for Casetta Ranch, according to its TDLR filing.
How much does Casetta Ranch cost and how big is it?
Casetta Ranch has an estimated construction value of $1.4M and approximately 2,430 square feet (about $576/sqft), based on its TDLR filing.
๐Scope of Work
NEW GROUND UP CONSTRUCTION OF A 1920 SF AMENITY CENTER AND NEW 510 SF PAVILION, WITH ASSOCIATED FENCED POOL DECK AND SWIMMING POOL.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 23, 2020
Review Complete
Inspection Complete
Closed
Apr 1, 2022
๐Related Projects
๐คSame Owner
$7.1M total๐Related City Permits
Building permits found at or near this location
Repair of failed drain piping by 14 tunnel. Drawing attached
Express: Foundation Repair
Replacement of an existing water heater
Replacement of complete existing central heat and air system with or without duct work
Attn: Mitchell Tolbert. Mr. Tolbert has approved the following request with the attached one line diagram. Install 112.5 KVA transformer to the existing 480 volt panel set (1) 400 amp 120/208 subpanel and refeed the existing EV chargers.
Property Owner
Design Firm
Registered Accessibility Specialist
Hays County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Hays County
Find General Contractors in Hays