Design review complete, construction may proceed
Howard Lane Phase 4 is a New Construction project located at 2714 Totley Rd, Pflugerville, TX 78660 in Pflugerville, Texas. The project has an estimated value of $4.0M covering 812,872 sq ft. Brohn Homes is the property owner and BGE, Inc. is the design firm of record. The project was registered with TDLR on April 14, 2025.
Residential subdivision, 180661acres
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 14, 2025
Review Complete
Apr 14, 2025
Inspection Complete
Closed
Building permits found at or near this location
REPAIR ON: Leak is coming from a broken 3 x 2 combo fitting about 3 feet down the master toilet line that serves as the vent for the toilet. the fi
Install Irrigation System
Request to Disconnect for main panel change out for 150 Main breaker for 150 meter can
Express: foundation repair
Install Irrigation System. ETJ
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis