SS 303
SS 303 is a new construction project at Collins St to SH 360, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2024). The project has an estimated value of $4.4M across about 127,000 sq ft.
๐Project Metrics
TDLR #TABS2021007417Project Closed
Project has been completed and closed
SS 303 is a New Construction project located at Collins St to SH 360, Arlington, TX 76010 in Arlington, Texas. The project has an estimated value of $4.4M covering 127,000 sq ft. TxDOT District: Fort Worth is the property owner and S & B Infrastructure, Ltd is the design firm of record. The project was registered with TDLR on January 13, 2021.
โFrequently Asked Questions
What is SS 303?
SS 303 is a new construction project at Collins St to SH 360 in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct new sidewalk, reconstruct existing sidewalk, add lighting and signage.
Is SS 303 open in Arlington?
Construction on SS 303 is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2024. The building is finished and very likely open.
Where is SS 303 located?
SS 303 is located at Collins St to SH 360, Arlington, TX, 76010, in Tarrant County.
Who is the owner or developer of SS 303?
TxDOT District: Fort Worth is the property owner/developer of record for SS 303, per its TDLR project registration.
Who is the architect or design firm for SS 303?
S & B Infrastructure, Ltd is the design firm of record for SS 303, according to its TDLR filing.
How much does SS 303 cost and how big is it?
SS 303 has an estimated construction value of $4.4M and approximately 127,000 square feet (about $35/sqft), based on its TDLR filing.
๐Scope of Work
Construct new sidewalk, reconstruct existing sidewalk, add lighting and signage.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 13, 2021
Review Complete
Inspection Complete
Closed
Jul 31, 2024
Property Owner
Design Firm
Registered Accessibility Specialist
Tarrant County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Tarrant County
Find General Contractors in Tarrant