HCG Lot 14 Suite 110 Re-Demise & Return to Shell Condition
๐Project Metrics
TDLR #TABS2021014511Project Closed
Project has been completed and closed
๐Scope of Work
LANDLORD WORK AND UTILITY SPLIT BETWEEN THE TWO SUITES INCLUDES DEMOING ARCHITECTURAL, MECHANICAL, ELECTRICAL AND PLUMBING ELEMENTS, RE-DEMISING & RETURNING SUITE 110 TO ORIGINAL SHELL CONDITION
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$1.2M total๐Related City Permits
Building permits found at or near this location
UPGRADING MAIN SERVICE TO 200 AMPS
Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with SCH 40 PVC. There will be (2-3) access holes on the front right and left sides of the house.
Install new 5.950 kw rooftop solar system for existing residential only.
Replacement of complete existing central heat and air system with or without duct work
Install new gas line for generator