MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System
MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System is a renovation/alteration project at 1220 Holcombe Blvd., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2024). The project has an estimated value of $1.4M across about 1,385 sq ft.
๐Project Metrics
TDLR #TABS2022006903Project Closed
Project has been completed and closed
MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System is a Renovation/Alteration project located at 1220 Holcombe Blvd., Houston, TX 77030 in Houston, Texas. The project has an estimated value of $1.4M covering 1,385 sq ft. MD Anderson Cancer Center is the property owner and HKS Inc. is the design firm of record. The project was registered with TDLR on December 8, 2021.
โFrequently Asked Questions
What is MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System?
MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System is a renovation/alteration project at 1220 Holcombe Blvd. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of an existing MRI scan room ad required support services, including control room and equipment room.
Is MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System open in Houston?
Construction on MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2024. The building is finished and very likely open.
Where is MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System located?
MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System is located at 1220 Holcombe Blvd., Houston, TX, 77030, in Harris County.
Who is the owner or developer of MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System?
MD Anderson Cancer Center is the property owner/developer of record for MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System, per its TDLR project registration.
Who is the architect or design firm for MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System?
HKS Inc. is the design firm of record for MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System, according to its TDLR filing.
How much does MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System cost and how big is it?
MDA IMRI Renovation in ACB4 - Siemens 1.5 T Espree MRI System has an estimated construction value of $1.4M and approximately 1,385 square feet (about $1.01K/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of an existing MRI scan room ad required support services, including control room and equipment room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 8, 2021
Review Complete
Inspection Complete
Closed
Oct 22, 2024