Lamb-Star
Lamb-Star is a renovation/alteration project at 3801 Parkwood Boulevard Suite 500, Frisco, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2022). The project has an estimated value of $375K across about 15,872 sq ft.
๐Project Metrics
TDLR #TABS2022017683Project Closed
Project has been completed and closed
Lamb-Star is a Renovation/Alteration project located at 3801 Parkwood Boulevard Suite 500, Frisco, TX 75034 in Frisco, Texas. The project has an estimated value of $375K covering 15,872 sq ft. Orangestar Frisco I LLC is the property owner and Go Studio is the design firm of record. The project was registered with TDLR on April 27, 2022.
โFrequently Asked Questions
What is Lamb-Star?
Lamb-Star is a renovation/alteration project at 3801 Parkwood Boulevard Suite 500 in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing office space in low-rise office building.
Is Lamb-Star open in Frisco?
Construction on Lamb-Star is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2022. The building is finished and very likely open.
Where is Lamb-Star located?
Lamb-Star is located at 3801 Parkwood Boulevard Suite 500, Frisco, TX, 75034, in Collin County.
Who is the owner or developer of Lamb-Star?
Orangestar Frisco I LLC is the property owner/developer of record for Lamb-Star, per its TDLR project registration.
Who is the architect or design firm for Lamb-Star?
Go Studio is the design firm of record for Lamb-Star, according to its TDLR filing.
How much does Lamb-Star cost and how big is it?
Lamb-Star has an estimated construction value of $375K and approximately 15,872 square feet (about $24/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of existing office space in low-rise office building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 27, 2022
Review Complete
Inspection Complete
Closed
Jul 31, 2022