G Systems
G Systems is a renovation/alteration project at 7825 RIDGEPOINT DRIVE, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2022). The project has an estimated value of $427K across about 31,664 sq ft.
๐Project Metrics
TDLR #TABS2022020268Project Closed
Project has been completed and closed
G Systems is a Renovation/Alteration project located at 7825 RIDGEPOINT DRIVE, Irving, TX 75063 in Irving, Texas. The project has an estimated value of $427K covering 31,664 sq ft. Royal Tech Owner, LLC is the property owner and Interprise Design is the design firm of record. The project was registered with TDLR on May 31, 2022.
โFrequently Asked Questions
What is G Systems?
G Systems is a renovation/alteration project at 7825 RIDGEPOINT DRIVE in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Improvements
Is G Systems open in Irving?
Construction on G Systems is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2022. The building is finished and very likely open.
Where is G Systems located?
G Systems is located at 7825 RIDGEPOINT DRIVE, Irving, TX, 75063, in Dallas County.
Who is the owner or developer of G Systems?
Royal Tech Owner, LLC is the property owner/developer of record for G Systems, per its TDLR project registration.
Who is the architect or design firm for G Systems?
Interprise Design is the design firm of record for G Systems, according to its TDLR filing.
How much does G Systems cost and how big is it?
G Systems has an estimated construction value of $427K and approximately 31,664 square feet (about $13/sqft), based on its TDLR filing.
๐Scope of Work
Tenant Improvements
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 31, 2022
Review Complete
Inspection Complete
Closed
Aug 19, 2022