๐Ÿ“‹Project Registered๐Ÿ”ง Additions to Existing Building๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

ABIA Existing Terminal Centralized Baggage Handling System Upgrades

3600 Presidential Blvd., Austin, TX 78719, Austin, TX, 78719
Pre-Construction15%

๐Ÿ“ŠProject Metrics

TDLR #TABS2022022043
$42.2M
Project Value
34,025
Square Feet
$1.24K/sqft
Cost/SqFt
2y 3mo
Duration
Registered:Jun 22, 2022
Start:Oct 1, 2022
Target:Dec 31, 2024
๐Ÿ“‹

Project Registered

Project has been registered with TDLR and is in pre-construction phase

๐Ÿ“‹Scope of Work

Expansion of the checked baggage system, security screening check point and additional tenant offices/lounge. Removal and relocation of select utility lines above head to allow new baggage system equipment installation at the exterior Apron.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
June 22, 2022
Construction Start
October 1, 2022
Expected Completion
December 31, 2024

๐Ÿ“Location & Views

Open in MapsGet Directions|30.20953, -97.66966

๐Ÿ“„Related City Permits

Building permits found at or near this location

2921 1/2 PRESIDENTIAL BLVD
117 ft away

Secondary Contractor Underground Water/Wastewater & Storm Lines

ActivePlumbing PermitRepairJul 2025
View Details
2025-089800 PP
๐Ÿ”งAustin Commercial LP
2921 1/2 PRESIDENTIAL BLVD
117 ft away

Installation of Fireline + Riser

ActivePlumbing PermitFirelineJul 2025
View Details
2025-089802 PP
๐Ÿ”งAustin Commercial LP
2921 1/2 PRESIDENTIAL BLVD
117 ft away

Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase II]

ActiveElectrical PermitNewJul 2025
View Details
2025-056332 EP
๐Ÿ”งSchmidt Electric Co Inc
2921 1/2 PRESIDENTIAL BLVD
117 ft away

Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase 1]

ActiveElectrical PermitNewJul 2025
View Details
2025-056331 EP
๐Ÿ”งSchmidt Electric Co Inc
2921 1/2 PRESIDENTIAL BLVD
117 ft away

Airport Expansion Project (City-Funded) 2 Phase Construction- (Phase 1) Construction of the first portion (south half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage as well as a toll plaza and pedestrian bridge Parking garage sf: 1336490 sf; toll plaza sf: 2928 sf; pedestrian bridge sf: 2335 sf. (Phase 2) Construction of the second portion (north half) of a new 7000-space seven-level cast-in-place fully-sprinklered open parking garage. [Phase II]

ActiveMechanical PermitNewJul 2025
View Details
2025-056332 MP
๐Ÿ”งMLN Company

๐Ÿ“Related Site Plans

City of Austin site plan approvals at this location

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists