Capstone Phase Two AC03
Capstone Phase Two AC03 is a new construction project at 6900 W. Parmer Lane, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $100.0M across about 368,726 sq ft.
๐Project Metrics
TDLR #TABS2022025500Inspection Complete
Final inspection completed, awaiting project closure
Capstone Phase Two AC03 is a New Construction project located at 6900 W. Parmer Lane, Austin, TX 78729 in Austin, Texas. The project has an estimated value of $100.0M covering 368,726 sq ft. Apple, Inc. - Michele Bunker is the property owner and HKS Architects, Inc. is the design firm of record. The project was registered with TDLR on August 5, 2022.
โFrequently Asked Questions
What is Capstone Phase Two AC03?
Capstone Phase Two AC03 is a new construction project at 6900 W. Parmer Lane in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 5-level Building Shell & Core
Is Capstone Phase Two AC03 open in Austin?
Construction on Capstone Phase Two AC03 is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Where is Capstone Phase Two AC03 located?
Capstone Phase Two AC03 is located at 6900 W. Parmer Lane, Austin, TX, 78729, in Travis County.
Who is the owner or developer of Capstone Phase Two AC03?
Apple, Inc. - Michele Bunker is the property owner/developer of record for Capstone Phase Two AC03, per its TDLR project registration.
Who is the architect or design firm for Capstone Phase Two AC03?
HKS Architects, Inc. is the design firm of record for Capstone Phase Two AC03, according to its TDLR filing.
How much does Capstone Phase Two AC03 cost and how big is it?
Capstone Phase Two AC03 has an estimated construction value of $100.0M and approximately 368,726 square feet (about $271/sqft), based on its TDLR filing.
๐Scope of Work
New 5-level Building Shell & Core
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 5, 2022
Review Complete
Aug 5, 2022
Inspection Complete
May 19, 2026
Closed
1383d
Construction phase
๐Related Projects
๐คSame Owner
$661.5M total๐Related City Permits
Building permits found at or near this location
NEW 1 STORY SINGLE-FAMILY RESIDENCE 4BEDROOM 2 BATH W/ ATTACHED GARAGE COVERED PORCH AND PATIO.
NEW 1 STORY SINGLE-FAMILY RESIDENCE 4BEDROOM 2 BATH W/ ATTACHED GARAGE COVERED PORCH AND PATIO.
NEW 1 STORY SINGLE-FAMILY RESIDENCE 4BEDROOM 2 BATH W/ ATTACHED GARAGE COVERED PORCH AND PATIO.
NEW 1 STORY SINGLE-FAMILY RESIDENCE 4BEDROOM 2 BATH W/ ATTACHED GARAGE COVERED PORCH AND PATIO.
New Facilities Building for MECH5
Property Owner
Design Firm
Registered Accessibility Specialist
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis