Funding type
This project is privately funded, on private land for private use.
Capstone Phase 2 AC12 in Austin, TX
6900 W. Parmer Lane, Austin, TX, 78729
Capstone Phase 2 AC12 is a new construction project at 6900 W. Parmer Lane, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $22.0M across about 33,000 sq ft.
- Estimated project value
- $22.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 33,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $667/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 10 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
652 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
304 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Capstone Phase 2 AC12
Apple, Inc. registered the Capstone AC12 Core & Shell project with TDLR in December 2022, targeting an August 2025 completion for a new multi-story building at 6900 W. Parmer Lane in Austin. The filing identifies the work as core and shell construction for a structure estimated at 33,000 square feet and valued at $22,000,000. This places the project in the Robinson Ranch area of Travis County, specifically within ZIP code 78729.
HKS Architects, Inc. is the design firm of record for this build. The registered accessibility specialist is Mark S Robinson. The project is privately funded and located on private land for private use. According to the TDLR filing, construction was scheduled to begin in October 2024.
Project Scale and Market Context
The estimated cost of $22,000,000 is above the median estimated cost for new construction filings in Travis County, which stands at $1,000,000. The size of 33,000 square feet exceeds the county median of 12,000 square feet. The calculated cost per square foot is $667, which is above the county median of $125 per square foot. The scheduled build window of 304 days is close to the county median of 304 days for similar projects.
Apple, Inc. has five other TDLR-registered projects in Austin totaling $306,051,000, including Capstone AC07 Core & Shell and Capstone AC03 Core & Shell. HKS Architects, Inc. has designed six other registered projects totaling $512,000,000. City of Austin permit records show at least 25 permits on file at this street address, with the 25 most recent issued between September 2024 and March 2026. These include plumbing, mechanical, electrical, and building permits.
Despite the registered target completion date of August 2025, the public record indicates that no plan review or inspection has been recorded. Consequently, whether the construction proceeded according to the original schedule is not confirmed in the available TDLR data. The project status remains registered, but specific progress milestones beyond the initial filing are not documented in the provided facts.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78729 (Austin)
One email per change. Unsubscribe in one click. Privacy.
Capstone Phase 2 AC12 is a New Construction project located at 6900 W. Parmer Lane, Austin, TX 78729 in Austin, Texas. The project has an estimated value of $22.0M covering 33,000 sq ft. Apple, Inc. - Michele Bunker is the property owner and HKS Architects, Inc. is the design firm of record. The project was registered with TDLR on December 19, 2022.
Frequently Asked Questions
What is the current construction status of Capstone AC12?
The TDLR record shows the project was registered in December 2022 with a target completion of August 2025. However, no plan review or inspection has been recorded since, so whether it proceeded is not confirmed in the public record.
Who is the owner and designer of the project?
The owner of record is Apple, Inc., represented by Michele Bunker. The design firm of record is HKS Architects, Inc. The registered accessibility specialist is Mark S Robinson.
How much does the project cost and how large is it?
The estimated cost is $22,000,000 for a new multi-story building core and shell. The total square footage is 33,000 sq ft, resulting in a cost per square foot of $667.
Is the project located in a flood zone?
It is designated as zone X according to the FEMA National Flood Hazard Layer.
What other projects is Apple building in Austin?
Apple, Inc. has five other TDLR-registered projects in Austin totaling $306,051,000. These include Capstone AC07 Core & Shell, Capstone AC03 Core & Shell, G2 (Parking Garage Two), Capstone - PG1, and Capstone - Site.
What is Capstone Phase 2 AC12?
Capstone Phase 2 AC12 is a new construction project at 6900 W. Parmer Lane in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New multi-story building core & shell
Is Capstone Phase 2 AC12 open in Austin?
Capstone Phase 2 AC12 was scheduled to finish construction in Aug 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Capstone Phase 2 AC12 located?
Capstone Phase 2 AC12 is located at 6900 W. Parmer Lane, Austin, TX, 78729, in Travis County.
Who is the owner or developer of Capstone Phase 2 AC12?
Apple, Inc. - Michele Bunker is the property owner/developer of record for Capstone Phase 2 AC12, per its TDLR project registration.
Who is the architect or design firm for Capstone Phase 2 AC12?
HKS Architects, Inc. is the design firm of record for Capstone Phase 2 AC12, according to its TDLR filing.
How much does Capstone Phase 2 AC12 cost and how big is it?
Capstone Phase 2 AC12 has an estimated construction value of $22.0M and approximately 33,000 square feet (about $667/sqft), based on its TDLR filing.
Scope of Work
New multi-story building core & shell
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6900 W. Parmer Lane, Austin, TX, 78729
Related Projects
Related City Permits
Building permits found at or near this location
Express: Foundation repair - installing steel piers
New Irrigation Installation
200amp outdoor main panel adding surge protect and grounding system No meter work. Austin Energy is the provider.
T-Pole 2026-070998 BP Blue Bonnet
NEW 1 STORY SINGLE-FAMILY RESIDENCE 4BEDROOM 2 BATH W/ ATTACHED GARAGE COVERED PORCH AND PATIO.
Watch all construction in 78729 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.