Capstone Phase Two AC07
๐Project Metrics
TDLR #TABS2023008879Project Registered
Project has been registered with TDLR and is in pre-construction phase
๐Scope of Work
New 5-level building core & shell
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$303.0M total๐๏ธSame Design Firm
$304.0M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater Replace 40-gallon Gas Water Heater Located: in laundry room closet
New Facilities Building for MECH5
Replacement of an existing water heater Replace 40-gallon electric water heater Located in hallway closet
Tunnel approximately 37 under foundation of home to access and replace all existing drain lines and reroute drain lines from beneath the home into the yard to connect to existing sewer line.
ePlan Review: Increase Occupant Load in 1st Floor Conference Room and 4th Floor Conference Room for Building 1