George Floyd Memorial at Tom Bass Ph 2 is a new construction project at 15108 Cullen Blvd., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2024). The project has an estimated value of $175K across about 16,000 sq ft.
Project has been completed and closed
George Floyd Memorial at Tom Bass Ph 2 is a New Construction project located at 15108 Cullen Blvd., Houston, TX 77047 in Houston, Texas. The project has an estimated value of $175K covering 16,000 sq ft. Harris County is the property owner and Harris County Engineering Department is the design firm of record. The project was registered with TDLR on December 13, 2022.
George Floyd Memorial at Tom Bass Ph 2 is a new construction project at 15108 Cullen Blvd. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of asphalt trail and decomposed granite pavilion with drainage and detention facilities.
Construction on George Floyd Memorial at Tom Bass Ph 2 is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2024. The building is finished and very likely open.
George Floyd Memorial at Tom Bass Ph 2 is located at 15108 Cullen Blvd., Houston, TX, 77047, in Harris County.
Harris County is the property owner/developer of record for George Floyd Memorial at Tom Bass Ph 2, per its TDLR project registration.
Harris County Engineering Department is the design firm of record for George Floyd Memorial at Tom Bass Ph 2, according to its TDLR filing.
George Floyd Memorial at Tom Bass Ph 2 has an estimated construction value of $175K and approximately 16,000 square feet (about $11/sqft), based on its TDLR filing.
Construction of asphalt trail and decomposed granite pavilion with drainage and detention facilities.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Dec 13, 2022
Review Complete
Inspection Complete
Closed
Apr 27, 2024
Need a contractor for this project?
Browse verified general contractors active in Harris County
Find General Contractors in Harris